Authority: IC 8-1-2-47; IC 8-1-2-69; IC 8-1-2-89
Affected: IC 8-1-1-3; IC 8-1-2-89
Sec. 25.
As used in this rule, "total required deposit" means the amount by which the cost of the main extension exceeds the immediate revenue allowance for the original depositor.
Indiana Utility Regulatory Commission; 170 IAC 8.5-4-25; filed Dec 5, 1990, 3:35 p.m.: 14 IR 568; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFAReadopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA