Authority: IC 8-1-2-47; IC 8-1-2-69; IC 8-1-2-89
Affected: IC 8-1-1-3; IC 8-1-2-89
Sec. 22.
As used in this rule, "subsequent connector's fee" means the cash fee equal to the cost per lot of the main extension determined in accordance with sections 29 through 31 of this rule, multiplied by the number of lots for which service is requested.
170 IAC 8.5-4-22