170 Ind. Admin. Code 4-5-10

Current through December 4, 2024
Section 170 IAC 4-5-10 - Submeter tests upon written request to owner; fee

Authority: IC 8-1-1-3; IC 8-1-2-36.5

Affected: IC 8-1-2-36.5

Sec. 10.

Submeter Tests upon Written Request to the Owner. Upon the written request of a tenant and if the tenant so desires, in the tenant's presence or in the presence of the tenant's authorized representative, each owner shall make a test of the accuracy of the tenant's submeter. The test shall be made during reasonable business hours at a time convenient to the tenant desiring to observe the test. If the submeter tests within the accuracy standards for self-contained watt-hour meters as established by the latest edition of ANSI C12.1-1982, a charge of up to $15 may be charged the tenant for making the test. Following completion of any requested test, the owner shall promptly advise the tenant of the results of the test.

170 IAC 4-5-10

Indiana Utility Regulatory Commission; 170 IAC 4-5-10; filed Dec 13, 1984, 3:13 pm: 8 IR 487, eff Jan 1, 1985 [IC 4-22-2-5 suspends the effectiveness of a rule document for thirty 30 days after filing with the Secretary of State. LSA Document #84-57(F) was filed Dec 13, 1984.]; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA
Readopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA