Authority: IC 8-1-1-3; IC 8-1-40.5-19
Affected: IC 8-1-40.5-3; IC 8-1-40.5-10
Sec. 2.
This rule applies to an electric utility, as defined under IC 8-1-40.5-3, meeting the threshold for qualified costs under IC 8-1-40.5-10(a).
170 IAC 4-10-2
Authority: IC 8-1-1-3; IC 8-1-40.5-19
Affected: IC 8-1-40.5-3; IC 8-1-40.5-10
Sec. 2.
This rule applies to an electric utility, as defined under IC 8-1-40.5-3, meeting the threshold for qualified costs under IC 8-1-40.5-10(a).
170 IAC 4-10-2