Section 170 IAC 12-1-6 - Labor and materials costs

Authority: IC 8-1-1-3

Affected: IC 8-1-2-10; IC 8-1-2-12

Sec. 6.

All amounts expended by a utility for labor and materials in connection with the purchase or installation of any Conservation Measures shall be charged to the customer for whom such activity is performed.

170 IAC 12-1-6

Indiana Utility Regulatory Commission; 36060: Residential Conservation Service Program Rule 6; filed May 6, 1981, 3:30 pm: 4 IR 908; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA