Idaho Admin. Code r. 58.01.01.797

Current through September 2, 2024
Section 58.01.01.797 - REGISTRATION FOR PERMIT BY RULE
01.Registration Process. Any owner or operator of a nonmetallic mineral processing plant that opts to operate under the permit by rule must register in the following manner:
a. Any new or modified processing plant must register fifteen (15) days prior to commencing operation or modification. The Department will acknowledge registration in writing within fifteen (15) days.
b. Any permitted processing plant must register with the Department and request termination of the current permit to construct or Tier II operating permit. The Department will normally act on the request within fifteen (15) days and notify the registrant in writing.

Registration for permit by rule does not relieve the owner or operator of portable equipment from the registration and relocation requirements of Section 500.

02.Registration Information. The following information must be provided by the registrant using forms furnished by the Department, or by other means approved by the Department.
a. For all crushers and grinding mills, the registrant shall supply information on the manufacturer, crusher type (such as jaw, cone), serial number, date of manufacture, and maximum throughput capacity.
b. For all screen decks, the registrant shall supply manufacturer name, physical size of screen, number of decks, serial number, and date of manufacture.
c. For all electrical generators, the registrant shall supply manufacturer name, rated output, and fuel.

Idaho Admin. Code r. 58.01.01.797

Effective March 28, 2023