D.C. Mun. Regs. tit. 25, r. 25-G605

Current through Register Vol. 71, No. 49, December 6, 2024
Rule 25-G605 - ISSUANCE OF LICENSE - REQUIRED PLAN REVIEWS AND APPROVALS
605.1

An applicant or operator shall submit to the Department for review and approval properly prepared plans and specifications before:

(a) The construction of a body art establishment;
(b) The conversion of an existing structure for use as a body art establishment; or
(c) Major renovation, remodeling, or alteration of an existing body art establishment.
605.2

Plans required by this section shall include specifications showing layout, arrangement, and construction materials, and the location, size, and type of fixed equipment and facilities.

605.3

Plans, specifications, an application form, and the applicable fee shall be submitted at least thirty (30) calendar days before beginning construction, remodeling, or conversion of a body art establishment.

605.4

The Department shall approve the completed plans and specifications if they meet the requirements of these regulations, and the Department shall report its findings to the license applicant or operator within thirty (30) days of the date the completed plans are received.

605.5

Plans and specifications that are not approved as submitted shall be changed to comply or be deleted from the project.

D.C. Mun. Regs. tit. 25, r. 25-G605

Final Rulemaking published at 64 DCR 13496 (12/29/2017)