D.C. Mun. Regs. tit. 10, r. 10-B2704

Current through Register Vol. 71, No. 44, November 1, 2024
Rule 10-B2704 - PREPARATION OF PLAT RECORD: SUBDIVIDE LAND AND GROUND
2704.1

The Surveyor shall prepare all plats of subdivisions for creating lots of record.

2704.2

The Surveyor shall not cause work to be done on the plat of subdivision until the required fee has been paid to the D.C. Treasurer and a receipt has been filed in the Office of the Surveyor.

2704.3

The fee shall be in accordance with a schedule of fees adopted by the Mayor.

2704.4

Recording of the plat of subdivision shall not take place until all information required thereon shall have been completed.

2704.5

All plats of subdivision shall comply with the following:

(a) The true bearings of the boundary lines shall be given in degree, minutes and seconds with their lengths in feet and decimal parts of a foot;
(b) All subdivisions shall be located by dimension to a point of record;
(c) All squares and lots shall be numbered; and
(d) All streets shall be identified by number, name or letter of the alphabet as required in § 2715.

D.C. Mun. Regs. tit. 10, r. 10-B2704

Commissioners' Order 67-651(a), § 3, effective May 16, 1967, 13 DCR 270 (June 19, 1967)
The authority to revise or adopt fee schedules was vested in the Mayor by § 2 of the Surveyor User Chargers Act of 1978, D.C. Law 2-149 (D.C. Code § 1-929 (1981)).