Current through Reigster Vol. 28, No. 6, December 1, 2024
Section 7103-60.0 - Table 202-1 Design Development Report Information60.160.1.4 Geology (including subsurface hydrology)60.1.7 Wells within 2500 L.F. of facility60.1.8 Groundwater quality background data60.2 Scaled drawing with 2-foot elevation contours showing the preliminary site layout including: 60.2.1 Preapplication treatment facility60.2.5 Soil investigation locations60.2.6 Access roads and utilities60.2.8 Monitor well locations60.2.9 Drainage structures60.2.11 Residences and habitable structures within or contiguous to the site60.3 Design wastewater characteristics, influent to preapplication treatment facility and treated effluent to spray fields (specific industrial-type wastewaters and some vegetation management schemes may require different or additional characterization): 60.3.1 Average and peak daily flows60.3.2 Biochemical Oxygen Demand (for preapplication facility management)60.3.3 Chemical Oxygen Demand (for land treatment system management)*60.3.4 Total Organic Carbon60.3.5 Total Suspended Solids60.3.6 Ammonia, Total Kjeldahl and Nitrate and Nitrite Nitrogen60.3.9 Sodium Adsorption Ratio (when appropriate)60.3.10 Electrical Conductivity60.3.12 Priority Pollutants**60.4 Detailed Soil Investigation Report (reference Table 202-2).60.5 Water Balance/determination of design wastewater loading(s).60.6 Nitrogen Balance/selection of cover crop and management scheme.60.7 Phosphorus and other constituent loading rates 60.8 Determination of land limiting constituent (LLC).60.9 Determination of wetted field area(s) and required storage volume.60.10 Process design for preapplication treatment facility. 60.10.1 Schematic of pump stations and unit processes60.10.2 Basin volumes, loading rates, hydraulic detention times, storage capacities, etc.60.10.3 Capacity of pumps, blowers and other mechanical equipment60.11 Groundwater and Effluent Monitoring Plan60.12 Proposed trust indenture for Department approval (for private domestic wastewater irrigation systems)60.13 *Chemical Oxygen Demand or Total Organic Carbon may be substituted for industrial wastewaters where appropriate.60.14 **Priority pollutant analysis is required for all industrial wastewaters and municipal wastewater systems that receive industrial process wastes. The analyses required depend on the particular process wastewater being discharged and will be determined on a case-by-case basis. However, in all cases the presence of industrial process wastewaters must be identified. A current listing of the 126 priority pollutants can be found by referencing 40 CFR Part 423, Appendix A, 1987.60.15 All design calculations must be submitted. Details and an example of the determination of needed land area and site life are given in the Guidance Section for Slow Rate Land Treatment and in Subsection 703, Example Calculations. THIS TABLE IS NOT AN EXHAUSTIVE LISTING OF ALL REQUIREMENTS FOR OBTAINING A SPRAY IRRIGATION PERMIT. PLEASE REVIEW ALL PARTS OF THESE REGULATIONS PRIOR TO SUBMISSION OF A DDR.
7 Del. Admin. Code § 7103-60.0