Section 7103-59.0 - Engineering Plans and Specifications59.1 Review 59.1.1 In order to obtain Department acceptance of the Design Development Report and issuance of a final Land Treatment System (LTS) Permit (reference Section 14.0), the owner must submit detailed construction plans and specifications. These should be completed in accordance with the rules and current policies of the Department. The plans and specifications will be reviewed for consistency with the Design Development Report and accepted engineering standards. Upon satisfactory review of the plans and specifications, a letter authorizing construction will be written. This approval is valid for two years. If construction has not begun within this period, the project will require reevaluation. Approval of privately owned, domestic wastewater irrigation systems is contingent upon execution of the trust indenture referenced in subsection 12.1.59.2 Final Inspection 59.2.1 Upon project completion, the design engineer or owner must certify, in writing and through submission of "as-builts", to the Department that the project was constructed in accordance with the approved plans and specifications. Upon receipt of this certification, a Department representative will inspect the completed facility. When the facility is verified as being complete and operational, a letter authorizing operation under the facility's LTS Permit will be issued. Upon granting written approval for operation, the Department shall give notice of such approval to any person who has submitted a written request for such notice.7 Del. Admin. Code § 7103-59.0