Current through Register Vol. 28, No. 4, October 1, 2024
Section 3007-8.0 - Major Event Report8.1 Each EDC shall notify the Commission of major events as soon as practical, but not more than 36 hours after the onset of a major event. Initial notification is required when more than 10% of an EDC's customers experience a sustained outage during a 24- hour period, calculated according to I.E.E.E. 1366 standards.8.2 Each EDC is expected to restore service to customers as quickly and safely as permitted by major event conditions. The EDC's restoration effort may be subject to review, subsequent corrective actions and penalties as permitted by 26 Del.C. § 1019.8.3 The EDC shall, within 15 business days after the end of a major event, submit a written report to the Commission, which shall include the following:8.3.1 The date and time when the EDC's major event control center opened and closed;8.3.2 The total number of customers' out-of-service over the course of the major event in six-hour increments;8.3.3 The date and time when 75%, 95% and 100% of customers affected by a major event were restored;8.3.4 The total number of trouble assignments repaired, by facility classification (poles, miles of wire, transformers);8.3.5 The time at which the mutual aid and non-company contractor crews were requested, arrived for duty and were released, and the mutual aid and non-contractor response(s) to the request(s) for assistance; and8.3.6 A timeline profile in six-hour increments of the number of company line crews, mutual aid crews, and non-company contractor line and tree crews working on restoration activities during the duration of the major event, summarized by total number of line, bucket, trouble, and tree types.26 Del. Admin. Code § 3007-8.0
23 DE Reg. 888 (4/1/2020) (Final)