Section 3007-7.0 - Annual Reports7.1 Reliability Performance7.1.1 By April 30 of each year, each EDC shall file with the Commission an annual Reliability Performance Report ("RPR") providing an overall assessment of the state of system reliability in the EDC's service territory. The RPR shall include an assessment of the results/effectiveness of reliability objectives, planned actions, projects, and programs implemented to achieve an acceptable reliability level. The RPR shall include the EDC's actual year-end performance measure results.7.1.2 The RPR shall include the EDC's delivery facilities' year-end performance measures as follows:7.1.2.1 SAIDI, SAIFI, and CAIDI measures:7.1.2.1.1 SAIDI, SAIFI, and CAIDI measures for the current year and three-year average reflecting Delaware performance, classified by distribution and substation components and in total, as compared to the benchmarks established in subsection 4.2 ;7.1.2.1.2 SAIDI, SAIFI, and CAIDI measures for the current and previous five (5) years compared to IEEE regional results, indicating the quartile achieved; and7.1.2.1.3 CAIDI measures for the current year and three-year average for each circuit providing service to Delaware customers, regardless of state of origin.7.1.3 The RPR shall identify distribution circuits that are identified by the EDC as having the poorest reliability according to the criteria in the EDC's Priority Feeder Program. 7.1.3.1 Current and previous five (5) year summary level OMS data to include:7.1.3.1.1 Number of outages by outage type;7.1.3.1.2 Number of outages by outage cause;7.1.3.1.3 Total number of customers at year end;7.1.3.1.4 Total number of customers that experienced an outage; and7.1.3.1.5 Total customer minutes of outage time.7.1.3.2 The EDC shall indicate any planned corrective actions to improve circuit performance and target dates for completion or explain why no action is required.7.1.4 The RPR shall include a summary of each major event for which data was excluded, and an assessment of the measurable impact on reported performance measures.7.1.5 In the event that an EDC's reliability performance measure does not meet the performance measures established in subsection 4.2, the RPR shall include a description of system issues impacting reliability and all corrective actions that are planned by the EDC; the estimated cost of corrective actions; and the target dates by which the corrective actions shall be completed. If no corrective actions are planned, an explanation shall be provided.7.2 Infrastructure, Safety, and Reliability Plan Annual Report7.2.1 By March 31st of each year, starting March 31, 2021, each EDC shall submit an ISR annual report for the previous year to include:7.2.1.1 Overall progress.7.2.1.2 Budget to actual variance for each spending category (both plant in service/COR and spending plan) with discussion of drivers.7.2.1.3 Comparison of actual versus planned project implementation with discussion of deviations including delays and accelerated work; and, explanation for inclusion of any program, project, or group of related projects with a total cost estimate exceeding $1,000,000 that were not previously included in an ISR.7.2.1.4 Comparison of I&M and vegetation management program activities to plan, with discussion of deviations and drivers.7.2.1.5 Comparison of any other projects or programs.7.2.1.6 An explanation of the variance for any program and/or project exceeding $1,000,000 that was completed in the reporting year and exceeds +/- 10% of the proposed budget.26 Del. Admin. Code § 3007-7.0
23 DE Reg. 888 (4/1/2020) (Final)