Current through November 30, 2024
Section 236.1047 - Training specific to locomotive engineers and other operating personnel(a)Operating personnel. Training provided under this subpart for any locomotive engineer or other person who participates in the operation of a train in train control territory shall be defined in the PTCDP as well as the PTCSP. The following elements shall be addressed:(1) Familiarization with train control equipment onboard the locomotive and the functioning of that equipment as part of the system and in relation to other onboard systems under that person's control;(2) Any actions required of the onboard personnel to enable, or enter data to, the system, such as consist data, and the role of that function in the safe operation of the train;(3) Sequencing of interventions by the system, including pre-enforcement notification, enforcement notification, penalty application initiation and post-penalty application procedures;(4) Railroad operating rules and testing (part 217) applicable to the train control system, including provisions for movement and protection of any unequipped trains, or trains with failed or cut-out train control onboard systems and other on-track equipment;(5) Means to detect deviations from proper functioning of onboard train control equipment and instructions regarding the actions to be taken with respect to control of the train and notification of designated railroad personnel; and(6) Information needed to prevent unintentional interference with the proper functioning of onboard train control equipment.(b)Locomotive engineer training. Training required under this subpart for a locomotive engineer, together with required records, shall be integrated into the program of training required by part 240 of this chapter.(c)Full automatic operation. The following special requirements apply in the event a train control system is used to effect full automatic operation of the train: (1) The PTCDP and PTCSP shall identify all safety hazards to be mitigated by the locomotive engineer.(2) The PTCDP and PTCSP shall address and describe the training required with provisions for the maintenance of skills proficiency. As a minimum, the training program must: (i) As described in § 236.1043(a)(2) , develop failure scenarios which incorporate the safety hazards identified in the PTCDP and PTCSP including the return of train operations to a fully manual mode;(ii) Provide training, consistent with § 236.1047(a) , for safe train operations under all failure scenarios and identified safety hazards that affect train operations;(iii) Provide training, consistent with § 236.1047(a) , for safe train operations under manual control; and(iv) Consistent with § 236.1047(a) , ensure maintenance of manual train operating skills by requiring manual starting and stopping of the train for an appropriate number of trips and by one or more of the following methods:(A) Manual operation of a train for a 4-hour work period;(B) Simulated manual operation of a train for a minimum of 4 hours in a Type I simulator as required; or(C) Other means as determined following consultation between the railroad and designated representatives of the affected employees and approved by FRA. The PTCDP and PTCSP shall designate the appropriate frequency when manual operation, starting, and stopping must be conducted, and the appropriate frequency of simulated manual operation.(d)Conductor training. Training required under this subpart for a conductor, together with required records, shall be integrated into the program of training required under this chapter.