47 C.F.R. § 25.114

Current through September 30, 2024
Section 25.114 - Applications for space station authorizations
(a)
(1) A license application filed pursuant to § 25.110(b)(2) for a GSO space station or NGSO space station or space-station constellation must comprise a comprehensive proposal and must be submitted on FCC Form 312, Main Form and Schedule S, with attached exhibits required by paragraph (d) of this section.
(2) An application for blanket authority for an NGSO constellation of space stations that are not all technically identical must provide the information required by paragraphs (c) and (d) of this section for each type of station in the constellation.
(3) For an application filed pursuant to the two-step procedure in § 25.110(b)(3) , the filing pursuant to § 25.110(b)(3)(iv) must be submitted on FCC Form 312, Main Form and Schedule S, with attached exhibits as required by paragraph (d) of this section, and must constitute a comprehensive proposal.
(4) For an application filed pursuant to the SCS procedure in § 25.125 , the filing must be submitted on FCC Form 312, Main Form and Schedule S, with attached exhibits as required by paragraph (d) of this section, and must constitute a comprehensive proposal.
(b) Each application for a new or modified space station authorization must contain the formal waiver required by 47 U.S.C. 304 .
(c) The following information shall be filed on FCC Form 312, Main Form and Schedule S:
(1) Name, address, and telephone number of the applicant;
(2) Name, address, and telephone number of the person(s), including counsel, to whom inquiries or correspondence should be directed;
(3) Type of authorization requested (e.g., launch authority, station license, modification of authorization);
(4)
(i) For each space station transmitting and receiving antenna beam (including telemetry and tracking beams but not command beams), specify channel center frequencies and bandwidths and polarization plan. For command beams, specify each of the center frequencies within a 5 MHz range or a range of 2 percent of the assigned bandwidth, whichever is smaller, and the polarization plan. If the space station can vary channel bandwidth in a particular frequency band with on-board processing, specify only the range of frequencies in that band over which the beam can operate and the polarization plan.
(ii) Specify maximum EIRP and maximum EIRP density for each space station transmitting antenna beam. If the satellite uses shapeable antenna beams, as defined in § 25.103 , specify instead maximum possible EIRP and maximum possible EIRP density within each shapeable beam's proposed coverage area. Provide this information for each frequency band in which the transmitting antenna would operate. For bands below 15 GHz, specify EIRP density in dBW/4 kHz; for bands at and above 15 GHz, specify EIRP density in dBW/MHz. If the EIRP density varies over time, specify the maximum possible EIRP density.
(iii)-(iv) [Reserved]
(v) For each space station receiving beam other than command beams, specify the gain-to-temperature ratio at beam peak. For receiving beams fed into transponders, also specify the minimum and maximum saturation flux density at beam peak. If the satellite uses shapeable beams, specify the minimum and maximum gain-to-temperature ratio within each shapeable beam's proposed coverage area, and for shapeable receiving beams fed into transponders, specify the minimum and maximum saturation power flux density within the 0 dB relative antenna gain isoline. Provide this information for each frequency band in which the receiving beam can operate. For command beams, specify the beam peak flux density at the command threshold;
(vi)
(A) For space stations in geostationary orbit, specify predicted space station antenna gain contour(s) for each transmit and receive antenna beam, except for beams where the contour at 8 dB below peak falls entirely beyond the edge of the visible Earth. These contour(s) should be plotted on an area map at 2 dB intervals down to 10 dB below the peak gain and at 5 dB intervals between 10 dB and 20 dB below the peak gain. Applicants must present this information in a GIMS-readable format.
(B) For space stations in non-geostationary orbits, specify for each unique orbital plane the predicted antenna gain contour(s) for each transmit and receive antenna beam for one space station if all space stations are identical in the constellation. If individual space stations in the constellation have different antenna beam configurations, specify the predicted antenna gain contours for each transmit and receive beam for each space station type and orbit or orbital plane requested. The contours should be plotted on an area map with the beam depicted on the surface of the earth with the space stations' peak antenna gain pointed at nadir to a latitude and longitude within the proposed service area. The contour(s) should be plotted at 2 dB intervals down to 10 dB below the peak gain and at 5 dB intervals between 10 dB and 20 dB below the peak gain. For intersatellite links, specify the peak antenna gain and 3 dB beamwidth.
(C) For space stations with shapeable antenna beams, specify the contours, as defined in paragraph (c)(4)(vi)(A) or (B) of this section, for the transmitting beam configuration that results in the highest EIRP density for the beams listed in paragraph (c)(4)(ii) of this section and for the receiving beam configuration with the smallest gain-to-temperature ratio and the highest required saturation power flux density for the beams listed in paragraph (c)(4)(v) of this section. If the shapeable beams are also steerable, include the contours that would result from moving the beam peak around the limit of the effective beam peak area and the 0 dB relative antenna gain isoline. The proposed maximum coverage area must be clearly specified.
(D) For a space station with steerable beams that are not shapeable, specify the applicable contours, as defined in paragraph (c)(4)(vi)(A) or (c)(4)(vi)(B) of this section, with a description of a proposed coverage area for each steerable beam or provide the contour information described in paragraph (c)(4)(vi)(C) of this section for each steerable beam.
(vii) For geostationary satellites with large numbers of identical fixed spot beams, other than DBS satellites, applicants may, as an alternative to submitting the information described in paragraph (c)(4)(vi) of this section with respect to these beams, provide the predicted antenna gain contours for one transmit and receive antenna beam, together with one of the following:
(A) An area map showing all of the spot beams depicted on the surface of the Earth;
(B) A table identifying the maximum antenna gain point(s) in latitude and longitude to the nearest 0.1 degree; or
(C) A map of the isolines formed by combining all of the spot beams into one or more composite beams. For non-geostationary satellites with large numbers of identical fixed beams on each satellite, applicants may, as an alternative to submitting the information described in paragraph (c)(4)(vi) of this section with respect to those beams, specify the predicted antenna gain contours for one transmit and receive beam pointed to nadir, together with an area map showing all of the spot beams depicted on the surface of the earth with the satellites' peak antenna gain pointed to a selected latitude and longitude within the service area.
(5) For space stations in geostationary orbit:
(i) Orbital location requested,
(ii) [Reserved]
(iii) East-west station-keeping range,
(iv) North-south station-keeping range, and
(v) Accuracy to which antenna axis attitude will be maintained;
(6) For space stations in non-geostationary orbits:
(i) The number of orbital planes and the number of space stations in each plane,
(ii) The inclination of the orbital plane(s),
(iii) The orbital period,
(iv) The apogee,
(v) The perigee,
(vi) The argument(s) of perigee,
(vii) Active service arc(s),
(viii) Right ascension of the ascending node(s), and
(ix) For each satellite in each orbital plane, the initial phase angle at the reference time;
(7) The frequency bands, types of service, and coverage areas;
(8) Calculated maximum power flux-density levels within each coverage area and energy dispersal bandwidths, if any, needed for compliance with § 25.208 , for the angles of arrival specified in the applicable paragraph(s) of § 25.208 , except for an NGSO FSS applicant certifying compliance with PFD limits under § 25.146(a)(1) ;
(9) [Reserved]
(10) Estimated operational lifetime;
(11) Whether the space station is to be operated on a common carrier basis;
(12) [Reserved]
(13) And the polarization information necessary to determine compliance with § 25.210(i) .
(d) The following information in narrative form shall be contained in each application, except space station applications filed pursuant to § 25.122 or § 25.123 :
(1) Overall description of system facilities, operations and services and explanation of how uplink frequency bands would be connected to downlink frequency bands;
(2)-(5) [Reserved]
(6) Public interest considerations in support of grant;
(7) Applicants for authorizations for space stations in the Fixed-Satellite Service, including applicants proposing feeder links for space stations operating in the 17/24 GHz Broadcasting-Satellite Service, must also include the information specified in § 25.140(a) . Applicants for authorizations for space stations in the 17/24 GHz Broadcasting-Satellite Service or applicants seeking authorization for FSS space stations transmitting in the 17.3-17.8 GHz band (space-to-Earth), must also include the information specified in § 25.140(b) ;
(8) Applications for authorizations in the Mobile-Satellite Service in the 1545-1559/1646.5-1660.5 MHz frequency bands shall also provide all information necessary to comply with the policies and procedures set forth in Rules and Policies Pertaining to the Use of Radio Frequencies in a Land Mobile Satellite Service, 2 FCC Rcd 485 (1987) (Available at address in § 0.445 of this chapter.);
(9) Applications to license multiple space station systems in the non-voice, non-geostationary mobile-satellite service under blanket operating authority shall also provide all information specified in § 25.142 ; and
(10) An application for space station authorization in the 1.6/2.4 GHz or 2 GHz Mobile-Satellite Service must include information required by § 25.143(b) ;
(11) Applications for space stations in the Direct Broadcast Satellite Service must include a clear and detailed statement of whether the space station is to be operated on a broadcast or non-broadcast basis;
(12) The information required by § 25.146 , if the application is for an NGSO FSS system authorization within the 10.7-30 GHz band.
(13) For satellite applications in the Direct Broadcast Satellite Service, if the proposed system's technical characteristics differ from those specified in the Appendix 30 BSS Plans, the Appendix 30A feeder link Plans, Annex 5 to Appendix 30 or Annex 3 to Appendix 30A of the ITU Radio Regulations, each applicant must provide:
(i) The information requested in Appendix 4 of the ITU Radio Regulations. Further, applicants must provide sufficient technical showing that the proposed system could operate satisfactorily if all assignments in the BSS and feeder link Plans were implemented.
(ii) Analyses of the proposed system with respect to the limits in Annex 1 to Appendices 30 and 30A of the ITU Radio Regulations.
(14) A description of the design and operational strategies that will be used to mitigate orbital debris, including the following information:
(i) A statement that the space station operator has assessed and limited the amount of debris released in a planned manner during normal operations. Where applicable, this statement must include an orbital debris mitigation disclosure for any separate deployment devices, distinct from the space station launch vehicle, that may become a source of orbital debris;
(ii) A statement indicating whether the space station operator has assessed and limited the probability that the space station(s) will become a source of debris by collision with small debris or meteoroids that would cause loss of control and prevent disposal. The statement must indicate whether this probability for an individual space station is 0.01 (1 in 100) or less, as calculated using the NASA Debris Assessment Software or a higher fidelity assessment tool;
(iii) A statement that the space station operator has assessed and limited the probability, during and after completion of mission operations, of accidental explosions or of release of liquids that will persist in droplet form. This statement must include a demonstration that debris generation will not result from the conversion of energy sources on board the spacecraft into energy that fragments the spacecraft. Energy sources include chemical, pressure, and kinetic energy. This demonstration should address whether stored energy will be removed at the spacecraft's end of life, by depleting residual fuel and leaving all fuel line valves open, venting any pressurized system, leaving all batteries in a permanent discharge state, and removing any remaining source of stored energy, or through other equivalent procedures specifically disclosed in the application;
(iv) A statement that the space station operator has assessed and limited the probability of the space station(s) becoming a source of debris by collisions with large debris or other operational space stations.
(A) Where the application is for an NGSO space station or system, the following information must also be included:
(1) A demonstration that the space station operator has assessed and limited the probability of collision between any space station of the system and other large objects (10 cm or larger in diameter) during the total orbital lifetime of the space station, including any de-orbit phases, to less than 0.001 (1 in 1,000). The probability shall be calculated using the NASA Debris Assessment Software or a higher fidelity assessment tool. The collision risk may be assumed zero for a space station during any period in which the space station will be maneuvered effectively to avoid colliding with large objects.
(2) The statement must identify characteristics of the space station(s)' orbits that may present a collision risk, including any planned and/or operational space stations in those orbits, and indicate what steps, if any, have been taken to coordinate with the other spacecraft or system, or what other measures the operator plans to use to avoid collision.
(3) If at any time during the space station(s)' mission or de-orbit phase the space station(s) will transit through the orbits used by any inhabitable spacecraft, including the International Space Station, the statement must describe the design and operational strategies, if any, that will be used to minimize the risk of collision and avoid posing any operational constraints to the inhabitable spacecraft.
(4) The statement must disclose the accuracy, if any, with which orbital parameters will be maintained, including apogee, perigee, inclination, and the right ascension of the ascending node(s). In the event that a system is not able to maintain orbital tolerances, e.g., its propulsion system will not be used for orbital maintenance, that fact must be included in the debris mitigation disclosure. Such systems must also indicate the anticipated evolution over time of the orbit of the proposed satellite or satellites. All systems must describe the extent of satellite maneuverability, whether or not the space station design includes a propulsion system.
(5) The space station operator must certify that upon receipt of a space situational awareness conjunction warning, the operator will review and take all possible steps to assess the collision risk, and will mitigate the collision risk if necessary. As appropriate, steps to assess and mitigate the collision risk should include, but are not limited to: Contacting the operator of any active spacecraft involved in such a warning; sharing ephemeris data and other appropriate operational information with any such operator; and modifying space station attitude and/or operations.
(B) Where a space station requests the assignment of a geostationary orbit location, it must assess whether there are any known satellites located at, or reasonably expected to be located at, the requested orbital location, or assigned in the vicinity of that location, such that the station keeping volumes of the respective satellites might overlap or touch. If so, the statement must include a statement as to the identities of those satellites and the measures that will be taken to prevent collisions;
(v) A statement addressing the trackability of the space station(s). Space station(s) operating in low-Earth orbit will be presumed trackable if each individual space station is 10 cm or larger in its smallest dimension, excluding deployable components. Where the application is for an NGSO space station or system, the statement shall also disclose the following:
(A) How the operator plans to identify the space station(s) following deployment and whether space station tracking will be active or passive;
(B) Whether, prior to deployment, the space station(s) will be registered with the 18th Space Control Squadron or successor entity; and
(C) The extent to which the space station operator plans to share information regarding initial deployment, ephemeris, and/or planned maneuvers with the 18th Space Control Squadron or successor entity, other entities that engage in space situational awareness or space traffic management functions, and/or other operators.
(vi) A statement disclosing planned proximity operations, if any, and addressing debris generation that will or may result from the proposed operations, including any planned release of debris, the risk of accidental explosions, the risk of accidental collision, and measures taken to mitigate those risks.
(vii) A statement detailing the disposal plans for the space station, including the quantity of fuel-if any-that will be reserved for disposal maneuvers. In addition, the following specific provisions apply:
(A) For geostationary orbit space stations, the statement must disclose the altitude selected for a disposal orbit and the calculations that are used in deriving the disposal altitude.
(B) For space stations terminating operations in an orbit in or passing through the low-Earth orbit region below 2,000 km altitude, the statement must disclose whether the spacecraft will be disposed of through atmospheric re-entry, specifying if direct retrieval of the spacecraft will be used. The statement must also disclose the expected time in orbit for the space station following the completion of the mission.
(C) For space stations not covered by either paragraph (d)(14)(vii)(A) or (B) of this section, the statement must indicate whether disposal will involve use of a storage orbit or long-term atmospheric re-entry and rationale for the selected disposal plan.
(D) For all space stations under paragraph (d)(14)(vii) (B) or (C) of this section, the following additional specific provisions apply:
(1) The statement must include a demonstration that the probability of success of the chosen disposal method will be 0.9 or greater for any individual space station. For space station systems consisting of multiple space stations, the demonstration should include additional information regarding efforts to achieve a higher probability of success, with a goal, for large systems, of a probability of success for any individual space station of 0.99 or better. For space stations under paragraph (d)(14)(vii)(B) of this section ending their mission in or passing through the low-Earth orbit region below 2000 km altitude, successful disposal is defined, for the purposes of this paragraph (d)(14)(vii)(D)(1), as atmospheric re-entry of the spacecraft as soon as practicable, but no later than five years following completion of the mission. For all other space stations under paragraphs (d)(14)(vii)(B) and (C) of this section, successful disposal will be assessed on a case-by-case basis.
(2) If planned disposal is by atmospheric re-entry, the statement must also include:
(i) A disclosure indicating whether the atmospheric re-entry will be an uncontrolled re-entry or a controlled targeted reentry.
(ii) An assessment as to whether portions of any individual spacecraft will survive atmospheric re-entry and impact the surface of the Earth with a kinetic energy in excess of 15 joules, and demonstration that the calculated casualty risk for an individual spacecraft using the NASA Debris Assessment Software or a higher fidelity assessment tool is less than 0.0001 (1 in 10,000).
(E) Applicants for space stations to be used only for commercial remote sensing may, in lieu of submitting detailed post-mission disposal plans to the Commission, certify that they have submitted such plans to the National Oceanic and Atmospheric Administration for review.
(viii) For non-U.S.-licensed space stations, the requirement to describe the design and operational strategies to minimize orbital debris risk can be satisfied by demonstrating that debris mitigation plans for the space station(s) for which U.S. market access is requested are subject to direct and effective regulatory oversight by the national licensing authority.
(15) Each applicant for a space station license in the 17/24 GHz Broadcasting-Satellite Service or the FSS transmitting in the 17.3-17.8 GHz band, shall include the following information as an attachment to its application:
(i) If the applicant proposes to operate in the 17.3-17.8 GHz band, a demonstration that the proposed space station will comply with the applicable power flux density limits in § 25.140(a)(3)(iii) or (b)(3) unless the applicant provides a certification under paragraph (d)(15)(ii) of this section.
(ii) In cases where the proposed space station will not comply with the applicable power flux density limits set forth in § 25.140(a)(3)(iii) or (b)(3) , the applicant will be required to provide a certification that all potentially affected parties acknowledge and do not object to the use of the applicant's higher power flux densities. The affected parties with whom the applicant must coordinate are those GSO 17/24 GHz BSS satellite networks or FSS satellite networks with space stations transmitting in the 17.3-17.8 GHz band that are located up to ±6° away. Excesses of more than 3 dB above the applicable power flux density levels specified in § 25.140(a)(3)(iii) or (b)(3) , must also be coordinated with 17/24 GHz BSS satellite networks located up to ±10° away.
(iii) Any information required by § 25.264(a)(6), (b)(4), or (d) .
(16) In addition to the requirements of paragraph (d)(15) of this section, each applicant for a license to operate a 17/24 GHz BSS space station that will be used to provide video programming directly to consumers in the United States, that will not meet the requirements of § 25.225 of this part, must include as an attachment to its application a technical analysis demonstrating that providing video programming service to consumers in Alaska and Hawaii that is comparable to the video programming service provided to consumers in the 48 contiguous United States (CONUS) is not feasible as a technical matter or that, while technically feasible, such service would require so many compromises in satellite design and operation as to make it economically unreasonable.
(17) [Reserved]
(18) For space stations in the Direct Broadcast Satellite service, the 17/24 GHz Broadcasting-Satellite Service, or FSS space stations transmitting in the 17.3-17.8 GHz band, maximum orbital eccentricity.

47 C.F.R. §25.114

68 FR 63997, Nov. 12, 2003, as amended at 69 FR 29901, May 26, 2004; 69 FR 47794, Aug. 6, 2004; 69 FR 54587, Sept. 9, 2004; 72 FR 50027, Aug. 29, 2007; 72 FR 60278, Oct. 24, 2007; 76 FR 50431, Aug. 15, 2011; 78 FR 8421, Feb. 6, 2013; 79 FR 8314, Feb. 12, 2014; 81 FR 55326, Aug. 18, 2016; 82 FR 59984, Dec. 18, 2017; 83 FR 34489, July 20, 2018; 85 FR 43733, July 20, 2020; 89 FR 34166, Apr. 30, 2024; 86 FR 49489, Sept. 3, 2021; 87 FR 72403, Nov. 25, 2022; 89 FR 58072, July 17, 2024
81 FR 55326, 9/19/2016; 82 FR 59984, 1/17/2018; 83 FR 22391, 5/15/2018; 83 FR 34489, 8/20/2018; 85 FR 43733, 8/19/2020; 85 FR 52450, 8/25/2020; 86 FR 49489, 9/3/2021; 87 FR 72403, 12/27/2022; 89 FR 34166, 5/30/2024; 89 FR 65223, 9/9/2024; 89 FR 58072, 7/17/2024; 89 FR 66615, 8/16/2024

Effective Date Notes: 1. At 85 FR 52450, Aug. 25, 2020, § 25.114 was amended by revising paragraph (d)(14). This amendment contains information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.