Current through September 30, 2024
Section 25.113 - Station construction, deployment approval, and operation of spare satellites(a) Construction permits are not required for earth stations. Construction of such stations may commence prior to grant of an earth station license at the applicant's own risk, subject to the requirements of § 1.1312 and part 17 of this chapter concerning environmental processing and construction, marking, and lighting of antenna structures.(b) Construction permits are not required for Ancillary Terrestrial Component (ATC) stations. A party with licenses issued under this part for launch and operation of 1.5/1.6 GHz or 1.6/2.4 GHz GHz Mobile-Satellite Service space stations and operation of associated ATC facilities may commence construction of ATC base stations at its own risk after commencing physical construction of the space stations, subject to the requirements of § 1.1312 and part 17 of this chapter. Such an MSS/ATC licensee may also conduct equipment tests for the purpose of making adjustments and measurements necessary to ensure compliance with the terms of its ATC license, applicable rules in this part, and technical design requirements. Prior to commencing such construction and pre-operational testing, an MSS/ATC licensee must notify the Commission of the commencement of physical satellite construction and the licensee's intention to construct and test ATC facilities. This notification must be filed electronically in the appropriate file in the International Communications Filing System database. The notification must specify the frequencies the licensee proposes to use for pre-operational testing and the name, address, and telephone number of a representative for the reporting and mitigation of any interference resulting from such testing. MSS/ATC licensees engaging in pre-operational testing must comply with §§ 5.83 , 5.85(c) , 5.111 , and 5.117 of this chapter regarding experimental operations. An MSS/ATC licensee may not offer ATC service to the public for compensation during pre-operational testing.(f) Construction permits are not required for U.S.-licensed space stations, except for stations that the applicant proposes to operate to disseminate program content to be received by the public at large, rather than only by subscribers. Construction of a station for which a construction permit is not required may commence, at the applicant's own risk, prior to grant of a license.(g) Except as set forth in paragraphs (h) and (i) of this section, approval for orbital deployment and a station license (i.e., operating authority) must be applied for and granted before a space station may be deployed and operated in orbit. Approval for orbital deployment may be requested in an application for a space station license. However, an application for authority to deploy and operate an on-ground spare satellite will be considered pursuant to the following procedures: (1) Applications for deployment and operation of an on-ground spare NGSO-like satellite will be considered pursuant to the procedures set forth in § 25.157 , except as provided in paragraph (g)(3) of this section.(2) Applications for deployment and operation of an on-ground spare GSO-like satellite will be considered pursuant to the procedures set forth in § 25.158 , except as provided in paragraph (g)(3) of this section.(3) Neither paragraph (g)(1) nor (g)(2) of this section will apply in cases where the space station to be deployed is determined to be an emergency replacement for a previously authorized space station that has been lost as a result of a launch failure or a catastrophic in-orbit failure.(h) An operator of NGSO space stations under a blanket license granted by the Commission, except for those granted pursuant to the application process in § 25.122 or § 25.123 , need not apply for license modification to operate technically identical in-orbit spare satellites in an authorized orbit. However, the licensee must notify the Commission within 30 days of bringing an in-orbit spare into service and certify that its activation has not exceeded the number of space stations authorized to provide service and that the licensee has determined by measurement that the activated spare is operating within the terms of the license.(i) An operator of NGSO space stations under a blanket license granted by the Commission, except for those granted pursuant to the application process in § 25.122 or § 25.123 , need not apply for license modification to deploy and operate technically identical replacement satellites in an authorized orbit within the term of the system authorization. However, the licensee must notify the Commission of the intended launch at least 30 days in advance and certify that its operation of the additional space station(s) will not increase the number of space stations providing service above the maximum number specified in the license.56 FR 24016, May 28, 1991, as amended at 61 FR 4366, Feb. 6, 1996; 61 FR 9951, Mar. 12, 1996; 61 FR 55582, Oct. 28, 1996; 62 FR 5927, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 68 FR 51502, Aug. 27, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005; 77 FR 3954, Jan. 26, 2012; 78 FR 8421, Feb. 6, 2013; 79 FR 8314, Feb. 12, 2014; 79 FR 27503, May 14, 2014; 81 FR 55326, Aug. 18, 2016; 85 FR 43733, July 20, 2020; 88 FR 21440, Apr. 10, 2023 81 FR 55326, 9/19/2016; 85 FR 43733, 8/19/2020; 88 FR 21440, 4/10/2023