40 C.F.R. § 53 app Figure F-1 to Subpart F of Part 53

Current through November 30, 2024
Appendix Figure F-1 to Subpart F of Part 53 - Designation Testing Checklist

DESIGNATION TESTING CHECKLIST FOR CLASS II

__________ __________ __________

Auditee Auditor signature Date

Compliance Status: Y = Yes N = No NA = Not applicable/Not available Verification Comments (Includes documentation of who, what, where, when, why) (Doc. #, Rev. #, Rev. Date)
Verification Verified by Direct Observation of Process or of Documented Evidence: Performance, Design or Application Spec. Corresponding to Sections of 40 CFR Part 53, Subparts E and F
Y N NA
Subpart E: Performance Specification Tests
Evaluation completed according to Subpart E § 53.50 to § 53.56
Subpart E: Class I Sequential Tests
Class II samplers that are also Class I (sequentialized) have passed the tests in § 53.57
Subpart F: Performance Spec/Test
Evaluation of Physical Characteristics of Clean Sampler - One of these tests must be performed:
§ 53.62 - Full Wind Tunnel
§ 53.63 - Inlet Aspiration
§ 53.64 - Static Fractionator
Evaluation of Physical Characteristics of Loaded Sampler
§ 53.65 Loading Test
One of the following tests must be performed for evaluation after loading: § 53.62 , § 53.63 , § 53.64
Evaluation of the Volatile Characteristics of the Class II Sampler § 53.66

40 C.F.R. 53 app Figure F-1 to Subpart F of Part 53