24 C.F.R. § 58.55

Current through October 31, 2024
Section 58.55 - Notice of intent to prepare an EIS

As soon as practicable after the responsible entity decides to prepare an EIS, it must publish a NOI/EIS, using the HUD recommended format and disseminate it in the same manner as required by 40 CFR parts 1500 through 1508.

24 C.F.R. § 58.55