Current through October 31, 2024
Section 450.155 - Readiness(a)General. An operator must document and implement procedures to assess readiness to proceed with the flight of a launch or reentry vehicle. These procedures must address, at a minimum, the following:(1) Readiness of vehicle and launch, reentry, or landing site, including any contingency abort location;(2) Readiness of safety-critical personnel, systems, software, procedures, equipment, property, and services; and(3) Readiness to implement the mishap plan required by § 450.173 .(b)Application requirements. An applicant must-(1) Demonstrate compliance with the requirements of paragraph (a) of this section through procedures that may include a readiness meeting close in time to flight; and(2) Describe the criteria for establishing readiness to proceed with the flight of a launch or reentry vehicle so that public safety is maintained.