Cal. Code Regs. tit. 8 § 5010.2

Current through Register 2024 Notice Reg. No. 50, December 13, 2024
Section 5010.2 - Disassembly - Additional Requirements for Dismantling of Booms and Jibs (Applies to Both the Use of Manufacturer Procedures and Employer Procedures)

NOTE: "Dismantling" includes dismantling for changing the length of booms and jibs.

(a) None of the pins in the pendants are to be removed (partly or completely) when the pendants are in tension.
(b) None of the pins (top or bottom) on boom sections located between the pendant attachment points and the crane/derrick body are to be removed (partly or completely) when the pendants are in tension.
(c) None of the pins (top or bottom) on boom sections located between the uppermost boom section and the crane/derrick body are to be removed (partly or completely) when the boom is being supported by the uppermost boom section resting on the ground (or other support).
(d) None of the top pins on boom sections located on the cantilevered portion of the boom being removed (the portion being removed ahead of the pendant attachment points) are to be removed (partly or completely) until the cantilevered section to be removed is fully supported.

Cal. Code Regs. Tit. 8, § 5010.2

1. New section filed 7-26-2022; operative 7-26-2022 pursuant to Government Code section 11343.4(b)(3) (Register 2022, No. 30). Filing deadline specified in Government Code section 11349.3(a) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20.

Note: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.

1. New section filed 7-26-2022; operative 7/26/2022 pursuant to Government Code section 11343.4(b)(3) (Register 2022, No. 30).