Cal. Code Regs. Tit. 21, div. 1, ch. 1, subch. 1, Applical Forms, app (g)

Current through Register 2025 Notice Reg. No. 2, January 10, 2025
Appendix (g) - Sample of Change Order

(g) Sample of Change Order.

SAMPLE CHANGE ORDER GEORGE WASHINGTON HIGH SCHOOL CAFETERIA BUILDING

PALOMARES HIGH SCHOOL DISTRICT

Change Order No. 1

December 1, 1966

File No. Application

To: Smith Construction Co., Contractors

You are hereby authorized to make the following changes, when this order has been approved by the Department of General Services:

Item 1. Lower the footing at the north end as shown on the attached sketch numbered XI.

Reason: Necessary to found footings on firm soil.

Requested by the Structural Engineer.

Extra--$150.00

Item 2. Furnish and install galvanized plate bolts of size shown on the attached sketch numbered XII with a three-inch length of the stem at bottom bent at 90 degrees to the axis, in lieu of the washer and nut on the embedded end as indicated on approved drawings.

Reason: Necessary to prevent turning of bolt in the concrete.

Requested by the Contractor.

No change in price
Original Contract Price.................................................... $25,245.00
This Change Plus............................................................ 150.00
$25,395.00

Approved

___________________________

School Authority

___________________________

Architect

___________________________

Structural Engineer or Other Applicable Professional Engineer Accepted

___________________________

Contractor

(See Section 38)

Cal. Code Regs. Tit. 21, div. 1, ch. 1, subch. 1, Applical Forms, app (g)

1. Amendment of Appendix (g) filed 9-8-83; effective 9-15-83 pursuant to Government Code Section 11346.2(d) (Register 83, No. 40).