Cal. Code Regs. Tit. 21, div. 1, ch. 1, subch. 1, Applical Forms, app (f)

Current through Register 2024 Notice Reg. No. 45, November 8, 2024
Appendix (f) - Sample of Semimonthly Report

(f) Sample of Semimonthly Report.

SAMPLE OF INSPECTOR'S SEMIMONTHLY REPORT

To be made on 1st and 15th of each month

Period from December 1 to December 15, 1966

File No.____________

Application No.____

MR. JOHN DOE, Architect

Pasadena, California

Subject: Compton Heights Elementary School

DEAR SIR:

Following is my report on the progress of the above job:

The foundation of the East Wing is complete.

Forms for the foundations of the Library Section are ready for the pouring of concrete. Trenches for the south wall footings were lowered one foot as directed by James Wilson, Structural Engineer.

Excavations are complete and part of the forms are in place for the West Wing.

Thirty percent of the excavation and backfill has been completed. Reinforcing is in place for the footing of the brick wall of the arcade.

Where forms have been stripped from the concrete already poured the surfaces show good workmanship.

Progress of work is slow but is progressing as fast as can be expected with the class of labor that we have.

Change Orders Numbers 1 and 2 have been received and have been called to the attention of the Superintendent.

Very truly yours,

(Signed) RICHARD ROE, Inspector

123 Camino Road

Compton Heights

Copies

1 copy to Department of General Services

1 copy to Engineer

1 copy to School Board

(See Sections 37 and 42)

Cal. Code Regs. Tit. 21, div. 1, ch. 1, subch. 1, Applical Forms, app (f)

1. Amendment of Appendix (f) filed 9-8-83; effective 9-15-83 pursuant to Government Code Section 11346.2(d) (Register 83, No. 40).