203.00.15 Ark. Code R. 001

Current through Register Vol. 49, No. 10, October, 2024
Rule 203.00.15-001 - Appendix "B" to the Rules Governing the Academic Facilities Partnership Program

ARKANSAS SCHOOL FACILITY MANUAL PROGRAM OF REQUIREMENTS (POR) SUMMARY AND REQUIRED SPACES

Click here to view image

Click here to view image

SUITABILITY ANALYSIS

Click here to view image

ARKANSAS SCHOOL FACILITY MANUAL

PROGRAM OF REQUIREMENTS

SCHOOL SUPPORT SPACES (NOT REQUIRED)

Click here to view image

Click here to view image

Click here to view image

Click here to view image

ARKANSAS SCHOOL FACILITY MANUAL

PROGRAM OF REQUIREMENTS CAREER EDUCATION (Required for 9-12)

Click here to view image

Click here to view image

Click here to view image

Click here to view image

ARKANSAS SCHOOL FACILITY MANUAL

PROGRAM OF REQUIREMENTS

REQUIRED SPACES NOTES

REQUIRED SPACES

STANDARD SIZE

Space

Square Feet

Notes

ACADEMIC CORE

E-AC-3

Kindergarten Classroom

1000

Maximum class size 20 students

E-AC-4

Kindergarten Restroom

45

One per kindergarten classroom

E-AC-5a

Elem Classroom Grades 1-3

850

Maximum class size 25 students

E-AC-5b

Elem Classroom Grades 4-5

850

Maximum class size 28 students

M-AC-1a

MS Classroom Grade 6

850

Maximum class size 28 students.

M-AC-1b

MS Classroom Grades 7-8

850

Maximum class size 30 students.

M-CE-1

Workforce Development

1,300

Two required for 700 or more students.

H-AC-1

HS Classroom

850

Maximum class size 30 students.

H-AC-2

Science Clrm/Lab-Gen/Physics

1,440

Minimum one plus one per each 500 students

H-AC-3

Science Clrm/Lab-Chemistry

1,440

One per each 500 students above 1,000 students.

H-AC-4

Science Clrm/Lab-Biol/Life Sci

1,440

One minimum to 1000 students. Additional for each 500 above 1000 students.

H-AC-5

Science Prep

300

H-AC-11

Chemical Storage

150

One miminum. Two above 1500 students.

H-AC-12

Multi-Use Room

1,500

H-AC-13

Instructional Multi-Purpose Rm

850

H-AC-8

Project Lab/Classroom

1,100

One minimum to 1000 students. Additional for each 500 above 1000 students.

E-MC-1

Reading Room/Circulation

Computed

10% of the student capacity multiplied by 35 SF per student.

E-MC-4

Computer Lab

900

M/H-MC-1

Reading Room/Circulation

Computed

10% of the student capacity multiplied by 40 SF per student.

M-MC-4

Media Center Computer Lab

900

E-VA-1

Art Room

1200

Required for 550 or more students.

E-VA-3

Art Material Storage

80

Required for 550 or more students.

E-AC-10

Fine Arts Instruction Room

1,200

Substituted for Art and Music Room in ES with less than 550 students

E-AC-11

Fine Arts Instruction Storage

100

Substituted for Art and Music Storage in ES with less than 550 students

M-VA-1

Art Room

1200

H-VA-1

Art Room

1200

Minimum one, plus one for each 500 students

M/H-VA-3

Art Material Storage

100

E-MU-1

Music Room

1,200

Required for 550 or more students.

E-MU-2

Music Storage

100

Required for 550 or more students.

M-MU-2

Music Storage

100

Required for 550 or more students.

M/H-MU-1

Instrumental Room

1,400

Minimum one plus additional room for more than 1000 students.

H-MU-2

Instrument Storage

Computed

Minimum 200 SF. One-half SF per student.

M-MU-8

Vocal Room

1,200

Required for 700 or more students

H-MU-8

Vocal Room

1,200

Minimum one for 500 students plus additional room for more than 2000 students.

H-MU-9

Vocal Storage

150

One per vocal room.

E-PE-1

PE Area

Computed

10 SF per student. Minimum 2,500 SF, Maximum 10,000 SF. Minimum single space size 900 SF.

M-PE-1

PE Area

Computed

15 SF per student. Minimum 4,000 SF, Maximum 10,000 SF. Minimum single space size 900 SF.

H-PE-1

PE Area

Computed

15 SF per student. Min 6,000 SF, Max 30,000 SF. Includes aux gym above 1000 students. Minimum 900 SF.

H-PE-3

Student Locker Room

Computed

Minimum 2 @ 400 SF. Maximum 6 @ 850 SF.

H-PE-4

Student Restroom/Shower

Computed

Minimum 2 @ 150 SF. Maximum 6 @ 350 SF.

H-CE

Career Education Program One

Varies

Total. Minimum 8,000 SF. Maximum 23,000 SF. 15 SF/student.

H-CE

Career Education Program Two

Varies

H-CE

Career Education Program Three

Varies

SPECIAL EDUCATION

E/M/H-SE-1

Self-contained Classroom

850

Two required for 1,000 students and above.

E/M/H-SE-2

Workroom/Conference

150

Two required for 1,000 students and above.

E/M/H-SE-3

Restroom/Shower

100

Two required for 1,000 students and above.

E/M/H-SE-4

Special Education/Resource

450

Two required for 1,000 students and above.

E/M/H-SE-5

Speech Therapy

475

Two required for 1,000 students and above.

E/M/H-SE-7

OT/PT

350

Two required for 1,000 students and above.

E-GT-1

Gifted and Talented

850

ADMINISTRATIVE SPACES

E/M/H-AD-3

Principal's Office

150

E/M/H-AD-4

Assistant Principal's Office

120

Required for 500 or more students.

E/M/H-AD-11

Guidance Counselor's Office

120

Minimum 1. Must maintain ratio of 1:450

E/M/H-AD-15

Health Center

250

PERFORMING ARTS

H-PA-1

Auditorium

Computed

Minimum 1500 SF. 5 SF per 9-12 student.

H-PA-3

Stage Area (includes wings)

Computed

Minimum 600 SF. 2 SF per 9-12 student.

STUDENT DINING

E/M/H-SD-1

Student Dining

Computed

One-half of the student capacity multiplied by 15 SF per student.

FOOD SERVICE

Only one of the two kitchens is to be used - either E-FS-1 or E-FS-2 - not both.

E/M/H-FS-1

Warming Kitchen

Computed

2 SF per student.

E/M/H-FS-2

Kitchen (total)

Computed

Equal to sum of areas for preparation, serving, dry food storage, cooler/freezer, and ware washing.

E/M/H-FS-2a

Preparation Area

Computed

Student capacity multiplied by 3.5 SF per student multiplied by 36%.

E/M/H-FS-2b

Serving Area

Computed

Student capacity multiplied by 3.5 SF per student multiplied by 34%.

E/M/H-FS-2c

Dry Food Storage

Computed

Student capacity multiplied by 3.5 SF per student multiplied by 11%.

E/M/H-FS-2d

Cooler/Freezer

Computed

Student capacity multiplied by 3.5 SF per student multiplied by 10%.

E/M/H-FS-2e

Ware Washing

Computed

Student capacity multiplied by 3.5 SF per student multiplied by 9%.

BUILDING SERVICES

E/M/H-CU-1

Workroom

Computed

0.5 SF per student. Minimum 125 SF.

E/M/H-MultiSt

Vertical Circulation

Computed

Vertical Circulation for Multi-Story Schools

E/M/H-BS-1

Large Group Restrooms

Computed

Equal to the sum of the program areas, excluding building services, multiplied by 3%.

E/M/H-BS-2

Custodial Closet

50

E/M/H-BS-3

Electrical Closet

50

E/M/H-BS-4

Telecommunications Room

64

E/M/H-BS-5

Corridors/Circulation

Computed

Equal to the sum of the program areas, excluding building services, multiplied by 20%.

E/M/H-BS-6

Mech/Elect Space/Decks

Computed

Equal to the sum of the program areas, excluding building services, multiplied by 5.5%.

E/M/H-BS-7

Storage Area

150

E/M/H-BS-8

Central Storage Area

150

E/M/H-BS-9

Loading/Receiving Area

100

E/M/H-BS-10

Main Cross-connect

150

203.00.15 Ark. Code R. 001

7/15/2015