Ariz. Admin. Code § 18-15-826

Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-15-826 - Provisions for Construction Contracts
A. Any Contract for Construction of a Water-Related Facility procured through the provisions of this Article, shall contain the following:
1. Requirement for performance and payment bonds or other security in a manner similar to those required under A.R.S. § 412574. The Authority may require performance and payment bonds or other security in amounts greater than those required under A.R.S. § 41-2574.
2. Requirement for retention of payments by the Authority as insurance for the proper performance of the Contract in a manner similar to that required by A.R.S. § 41-2576. The Authority may require retention in amounts greater than those required by A.R.S. § 41-2576.
3. Requirement for progress payments made by the Authority to the Contractor in a manner similar to that required under A.R.S. § 41-2577. The Authority may specify a progress payment schedule that differs from that required by A.R.S. § 41-2577.
4. Provisions similar to those required under A.R.S. § 41-2580. The Authority may specify additional requirements.
B. Pursuant to A.R.S. § 41-2501(C), the Authority adopts A.R.S. § 41-2583 for any Contract for Construction of a Water-Related Facility procured through the provisions of this Article.
C. The Authority may require that any Construction of a Water-Related Facility be subject to oversight by State of Arizona personnel.

Ariz. Admin. Code § R18-15-826

New Section made by final expedited rulemaking at 30 A.A.R. 806, effective 4/3/2024.