Ariz. Admin. Code § 12-7-136

Current through Register Vol. 30, No. 50, December 13, 2024
Section R12-7-136 - Subsurface Pressure Tests and Reservoir Surveys
A. Each operator shall conduct a test, within 30 days after completion, to determine the reservoir pressure on the discovery well of any new pool. The test shall be made after the well has been shut-in for at least 24 hours, and the results shall be reported in writing to the Commission within 15 days after the completion of the test.
B. The Commission may require subsurface pressure measurements on a number of wells in any pool to provide data to determine reservoir characteristics. The survey shall be made by the operator and shall provide a description of the test method and results including fluids, temperature, and pressure data and may require supervision by a qualified agent of the Commission. The results shall be reported in writing to the Commission within 15 days of the completion of the survey.

Ariz. Admin. Code § R12-7-136

Former Rule 302; Amended effective September 29, 1982 (Supp. 82-5). Amended effective February 23, 1993 (Supp. 93-1).