20 Alaska Admin. Code § 25.507

Current through October 17, 2024
Section 20 AAC 25.507 - Change of an approved program
(a) Except as otherwise provided by 20 AAC 25.015, if an operator desires to make a substantive change in a program or activity for which commission approval is required and has been obtained under AS 31.05 or this chapter, complete details of the well's current condition and the proposed change must be submitted to the commission with an Application for Sundry Approvals (Form 10-403). A change to an approved program or activity may not be undertaken without commission approval. The commission will condition its approval as the commission considers necessary or appropriate to ensure compliance with the standards on which the original approval was based.
(b) If operational necessity requires prompt action, oral approval of a change may be obtained from the commission. The required Application for Sundry Approvals must be submitted within three days for final approval by the commission. That application must set out the name of the person who provided approval and the date of the oral approval.

20 AAC 25.507

Eff. 4/2/86, Register 97; am 11/7/99, Register 152

Authority:AS 31.05.030

AS 31.05.095