A permit issued to any new or existing Phase II facility with a cooling water intake structure must include as a condition compliance with the applicable requirements set out in 40 C.F.R. 125.80 through 40 C.F.R. 125.99, adopted by reference in 18 AAC 83.010.
18 AAC 83.640
Authority:AS 44.46.020
AS 46.03.010
AS 46.03.020
AS 46.03.050
AS 46.03.100
AS 46.03.110