Plans, specifications, and related materials shall be submitted to the Technical Staff in accordance with procedures prescribed in the Manual of Procedures and, unless otherwise provided, shall be made in three stages: Schematic Plan Submittal, Preliminary Plan Submittal, and Final Plan Submittal.
Author: Stedmann B. McCollough, Director
Ala. Admin. Code r. 170-X-3-.06
Statutory Authority:Code of Ala. 1975, § 41-9-141.