Section 99-99-201 - Authorization for water well supply and transmission project
(a) The department of economic planning and development [economic development and stabilization board] is authorized to proceed with the design and construction of the city of Gillette well supply and water transmission project as described in the interdepartmental water conference feasibility report to the 1978 session of the Wyoming legislature. Prior to commencement of construction of the water supply and transmission project, the department of economic planning and development [economic development and stabilization board] shall:
(i) Enter into a signed project agreement with the city of Gillette, Wyoming, for the construction, operation and maintenance of the project by the city as specified in W.S. 41-2-201 through 41-2-203;
(ii) Assign the project to the city for design, construction, operation and repayment as specified by law, after execution of the project agreement with the city of Gillette and upon approval of the governor as specified in W.S. 41-2-115;
(iii) Approve the final design, plans and specifications and construction schedule for the project facilities and development of water service from the project facilities which shall include water supply provisions for the city of Gillette and surrounding area municipal and domestic requirements, the town of Moorcroft supplemental and emergency requirements and community of Rozet municipal and domestic requirements, the agricultural, domestic and stockwater requirements within or that can be served by the water well field area and the industrial requirements that can be served by the well field and water transmission lines.
(iv) Repealed by Laws 1987, ch. 99, § 5.
(v) Repealed by Laws 1987, ch. 99, § 5.