Wyo. Stat. § 99-3-504

Current through the 2024 legislative session
Section 99-3-504 - Level III construction projects - rehabilitation
(a) Authorization is granted for the Level III rehabilitation construction projects identified in this section, subject to the general conditions specified in W.S. 99-3-104.

Source notes for subsection (a): (Laws 2001, Ch. 2, § 1.)

(b) Project - Baggs Water Supply Rehabilitation Project:
(i) Project sponsor: Town of Baggs;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Diversion and intake facilities and other miscellaneous appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Two hundred forty thousand dollars ($240,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed one hundred twenty thousand dollars ($120,000.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission one hundred twenty thousand dollars ($120,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2005; and
(vii) Special conditions:
(A) The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources;
(B) The sponsor may be reimbursed for project expenditures, which occurred prior to April 1, 2003.

Source notes for subsection (b): (Laws 2001, Ch. 2, § 1; 2003, Ch. 69, § 8.)

(c) Project - Bridger Valley Intake Structure Rehabilitation Project:
(i) Project sponsor: Bridger Valley Joint Powers Board;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Rehabilitation of the intake and raw water diversion facility, construction of a water storage tank, and transmission pipeline and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: One million ten thousand dollars ($1,010,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed five hundred five thousand dollars ($505,000.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission five hundred five thousand dollars ($505,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (c): (Laws 2001, Ch. 2, § 1; 2002, Ch. 88, § 9.)

(d) Project - Cheyenne South Crow Dam Water Supply Rehabilitation Project:
(i) Project sponsor: City of Cheyenne;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Final design services, plans and specifications, for rehabilitating the South Crow Dam, for adding a supervisory control and data acquisition control system, for pipelines needed to connect to the city's treatment and conveyance system, rehabilitation of the dam, installation of the pipeline, installation of telemetry, construction of a valve house and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: One million five hundred thousand dollars ($1,500,000.00);
(v) Repealed by Laws 2002, Ch. 88, §16.
(vi) Project Grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the final design, plans and specifications for the project, construction engineering, project land procurement, permit procurement, and construction of the project an amount not to exceed seven hundred fifty thousand dollars ($750,000.00) or fifty percent (50%) of the actual development costs, whichever is less; and
(vii) Appropriation: There is appropriated from water development account II to the commission seven hundred fifty thousand dollars ($750,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2007;
(viii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (d): (Laws 2001, Ch. 2, § 1; 2002, Ch. 88, § 10.)

(e) Project - Dayton Water Supply Rehabilitation Project:
(i) Project sponsor: Town of Dayton;
(ii) Project purpose: Municipal and rural domestic water supply;
(iii) Project description: Replacement of an existing transite pipeline, installation of a new booster station, installation of pipeline to an existing booster station and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: One million thirty-two thousand dollars ($1,032,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed six hundred nineteen thousand two hundred dollars ($619,200.00) or sixty percent (60%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission six hundred nineteen thousand two hundred dollars ($619,200.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible for securing forty percent (40%) of the project budget from other sources.

Source notes for subsection (e): (Laws 2001, Ch. 2, § 1; 2002, Ch. 88, § 11.)

(f) Project - Encampment Raw Water Line Rehabilitation Project:
(i) Project sponsor: Town of Encampment;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Final design services, plans and specifications, for the replacement of the remaining nonpiped portion of the raw water conveyance system extending from the North Fork of the Encampment River to the town's water system, installation of the pipeline and for appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Eight hundred thousand dollars ($800,000.00);
(v) Repealed By Laws 2002, Ch. 88, § 16.
(vi) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the final design, plans, and specifications, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred thousand dollars ($400,000.00) or fifty percent (50%) of the actual development costs, whichever is less; and
(vii) Appropriation: There is appropriated from water development account II to the commission four hundred thousand dollars ($400,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2006;
(viii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (f): (Laws 2001, Ch. 2, § 1; 2002, Ch. 88, § 12.)

(g) Project - Gillette Central Pressure Zone Isolation Rehabilitation Project:
(i) Project sponsor: City of Gillette;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Final design services, plans and specifications, for improving fire flows, meeting Safe Drinking Water Act minimum pressure and disinfection requirements, installation of transmission lines and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: One million five hundred nineteen thousand dollars ($1,519,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the final design, plans and specifications, project land procurement, construction engineering and construction of the project an amount not to exceed seven hundred fifty-nine thousand five hundred dollars ($759,500.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission seven hundred fifty-nine thousand five hundred dollars ($759,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2006; and
(vii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (g): (Laws 2001, Ch. 2, § 1; 2002, Ch. 88, § 13.)

(h) Project -Hugus-Mullison Ditch Rehabilitation Project:
(i) Project sponsor: Hugus Watershed Improvement District;
(ii) Project purpose: Irrigation, seepage and flood control;
(iii) Project description: Canal lining, replacement of culverts at street crossings to increase the capacity of the ditch and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Six hundred fifty thousand dollars ($650,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed three hundred twenty-five thousand dollars ($325,000.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission three hundred twenty-five thousand dollars ($325,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (h): (Laws 2001, Ch. 2, § 1.)

(j) Project - Laramie North Side Water Supply Rehabilitation Project:
(i) Project sponsor: City of Laramie;
(ii) Project purpose: Municipal;
(iii) Project description: Permit procurement, right-of-way acquisition, final design services, plans and specifications required to rehabilitate an existing twenty (20) inch diameter pipeline, to add additional storage facilities in east Laramie, to connect the east side storage to the Laramie water system, the rehabilitation of a twenty (20) inch and twenty-four (24) inch diameter transmission pipeline, the replacement of a portion of the twenty (20) inch diameter line, cathodic protection and for appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Four million one hundred ninety-five thousand dollars ($4,195,000.00);
(v) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for permit procurement, right-of-way acquisition, final design, plans and specifications, construction engineering and construction of the project an amount not to exceed two million ninety-seven thousand five hundred dollars ($2,097,500.00) or fifty percent (50%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of seven and one-quarter percent 7.25%);
(vi) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for permit procurement, right-of-way acquisition, final design, plans and specifications, construction engineering and construction of the project an amount not to exceed two million ninety-seven thousand five hundred dollars ($2,097,500.00) or fifty percent (50%) of the actual development costs, whichever is less; and
(vii) Appropriation: There is appropriated from water development account II to the commission four million one hundred ninety five thousand dollars ($4,195,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2007.

Source notes for subsection (j): (Laws 2001, Ch. 2, § 1; 2002, Ch. 88, § 14.)

(k) Project - Pine Haven Pipeline Rehabilitation Project:
(i) Project sponsor: Town of Pine Haven;
(ii) Project purpose: Municipal;
(iii) Project description: The project includes installation of pipelines to connect the town's existing well directly to the storage system, to tie the storage system to the distribution system and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Two hundred thirty-five thousand dollars ($235,000.00);
(v) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed one hundred seventeen thousand five hundred dollars ($117,500.00) or fifty percent (50%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of seven and one-quarter percent (7.25%);
(vi) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed one hundred seventeen thousand five hundred dollars ($117,500.00) or fifty percent (50%) of the actual development costs, whichever is less; and
(vii) Appropriation: There is appropriated from water development account II to the commission two hundred thirty-five thousand dollars ($235,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2005.

Source notes for subsection (k): (Laws 2001, Ch. 2, § 1.)

(m) Project - Powell Water Supply Rehabilitation Project:
(i) Project sponsor: City of Powell;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Right-of-way acquisition, final design services, including permitting services and providing plans and specifications, for replacing an old water storage tank, for recoating an existing water tank, for providing miscellaneous piping and pressure reducing valves to create additional pressure zones to comply with the Safe Drinking Water Act's minimum pressure requirements, construction of a new storage tank, valves, pressure reducing valves and for appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Two million three hundred twenty-six thousand dollars ($2,326,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the right-of-way acquisition, final design, plans and specifications, construction engineering and construction of the project an amount not to exceed one million one hundred sixty-three thousand dollars ($1,163,000.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission one million one hundred sixty-three thousand dollars ($1,163,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2008; and
(vii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (m): (Laws 2001, Ch. 2, § 1; 2002, Ch. 88, § 15; 2003, Ch. 69, § 9; 2004, Ch. 118, § 6.)

(n) Project - Riverton Raw Water Supply Rehabilitation Project:
(i) Project sponsor: City of Riverton;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Project construction, including final design services, plans and specifications, for rehabilitating a raw water conveyance system which serves the Riverton Valley Irrigation District, the LeClair Irrigation District, and the City of Riverton and for appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Two million one hundred seventy-three thousand dollars ($2,173,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the final design, plans and specifications for the project, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million eighty-six thousand five hundred dollars ($1,086,500.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission one million eighty-six thousand five hundred dollars ($1,086,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2009;
(vii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (n): (Laws 2001, Ch. 2, § 1; 2004, Ch. 118, § 7; 2009, Ch. 38, § 2.)

(o) Project - Sheridan Raw Water Supply Rehabilitation Project:
(i) Project sponsor: City of Sheridan;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: Final design services, plans and specifications, for rehabilitating a raw water conveyance system which serves the city golf course and for appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: One hundred thousand dollars ($100,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the final design, plans and specifications for the project an amount not to exceed fifty thousand dollars ($50,000.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission fifty thousand dollars ($50,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

Source notes for subsection (o): (Laws 2001, Ch. 2, § 1.)

(p) Project - Wamsutter Water Supply Rehabilitation Project:
(i) Project sponsor: Town of Wamsutter;
(ii) Project purpose: Municipal and domestic water supply;
(iii) Project description: The project includes refinancing of an existing state land and investment board emergency loan that funded the replacement of an old three (3) inch diameter transmission line, funding of the replacement of another existing transmission pipeline from the water supply well to town and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Two hundred eighty thousand dollars ($280,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for refinancing the state land and investment board emergency loan for replacing an existing three (3) inch diameter pipeline, and for the design, permit procurement, project land procurement, construction engineering, and construction of a new rehabilitation project an amount not to exceed one hundred forty thousand dollars ($140,000.00) or fifty percent (50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission one hundred forty thousand dollars ($140,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

W.S. 99-3-504