Current through the 2024 legislative session
Section 99-3-404 - Level III construction projects - rehabilitation(a) Authorization is granted for the Level III rehabilitation construction projects identified in this section, subject to the general conditions specified in W.S. 99-3-104. Source notes for subsection (a): (Laws 2000, Ch. 96, § 1.)
(b) Project - Afton Water Supply Rehabilitation Project:(i) Project sponsor: Town of Afton;(ii) Project purpose: Municipal and domestic water supply;(iii) Project description: Rehabilitation of existing transmission pipeline and water system and appurtenances necessary to make the project function in the manner intended;(iv) Total project budget: Four hundred fifty thousand dollars ($450,000.00);(v) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred twenty-five thousand dollars ($225,000.00) or fifty percent (50%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of seven and one-quarter percent (7.25%);(vi) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred twenty-five thousand dollars ($225,000.00) or fifty percent (50%) of the actual development costs, whichever is less;(vii) Appropriation: There is appropriated from water development account II to the commission four hundred fifty thousand dollars ($450,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2004. Source notes for subsection (b): (Laws 2000, Ch. 96, § 1.)
(c) Project - Crestview Water Supply Rehabilitation Project: (i) Project sponsor: Crestview Estates Improvement and Service District;(ii) Project purpose: Rural domestic water supply;(iii) Project description: Rehabilitation of existing well, connection to Antelope Valley water system and appurtenances necessary to make the project function in the manner intended;(iv) Total project budget: Eighty-two thousand dollars ($82,000.00);(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed forty-one thousand dollars ($41,000.00) or fifty percent (50%) of the actual development costs, whichever is less;(vi) Appropriation: There is appropriated from water development account II to the commission forty-one thousand dollars ($41,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2004;(vii) Special condition: The sponsor is responsible for acquiring the remaining fifty percent (50%) of the total project budget from other sources. Source notes for subsection (c): (Laws 2000, Ch. 96, § 1.)
(d) Project - Goshen Irrigation District Water System Rehabilitation Project: (i) Project sponsor: Goshen Irrigation District;(ii) Project purpose: Rehabilitation of an irrigation delivery system;(iii) Project description: Rehabilitation of the canal and lateral delivery system including slide gates, implementation of seepage control measures, automation of the delivery system and appurtenances necessary to make the project function in the manner intended;(iv) Total project budget: Four million four hundred fifty-two thousand dollars ($4,452,000.00);(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed two million two hundred twenty-six thousand dollars ($2,226,000.00) or one hundred percent (100%) of the materials cost, whichever is less;(vi) Appropriation: There is appropriated from water development account II to the commission two million two hundred twenty-six thousand dollars ($2,226,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2010;(vii) Special conditions: The sponsor is responsible for all costs related to project design, permit procurement, land procurement, construction engineering and construction of the project. Source notes for subsection (d): (Laws 2000, Ch. 96, § 1; 2004, Ch. 118, § 5.)
(e) Project - Highline Ditch Rehabilitation: (i) Project sponsor: Highline Watershed Improvement District;(ii) Project purpose: Irrigation water supply;(iii) Project description: Rehabilitation of aging conveyance infrastructure including canals or irrigation ditches, measuring devices and appurtenances necessary to make the project function in the manner intended;(iv) Total project budget: Seven Hundred twenty-six thousand dollars ($726,000.00);(v) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred sixty-three thousand dollars ($363,000.00) or fifty percent (50%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of six percent (6%);(vi) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred sixty-three thousand dollars ($363,000.00) or fifty percent (50%) of the actual development costs, whichever is less;(vii) Appropriation: There is appropriated from water development account II to the commission seven hundred twenty-six thousand dollars ($726,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2004. Source notes for subsection (e): (Laws 2000, Ch. 96, § 1.)
(f) Project - Lander Water Supply Rehabilitation Project: (i) Project sponsor: City of Lander;(ii) Project purpose: Municipal and domestic water supply;(iii) Project description: Replacement of an existing raw water transmission pipeline, incorporation of a Level II groundwater test well into the potable water system, a pressure reducing station, air relief stations, and appurtenances necessary to make the project function in the manner intended;(iv) Total project budget: Two million ninety-six thousand dollars ($2,096,000.00);(v) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million forty-eight thousand dollars ($1,048,000.00) or fifty percent (50%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of seven and one-quarter percent (7.25%);(vi) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million forty-eight thousand dollars ($1,048,000.00) or fifty percent (50%) of the actual development costs, whichever is less;(vii) Appropriation: There is appropriated from water development account II to the commission two million ninety-six thousand dollars ($2,096,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2004;(viii) Special condition: The sponsor shall purchase the well completed during the Level II study for a price of ten thousand two hundred dollars ($10,200.00) or forty percent (40%) of the actual construction costs, whichever is less. The sponsor may purchase the well with a lump sum payment or with amortized payments based on forty percent (40%) of the actual construction costs for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual interest rate of seven and one-quarter percent (7.25%). In either event, a purchase agreement shall be completed prior to commencement of the project. Source notes for subsection (f): (Laws 2000, Ch. 96, § 1; 2001, Ch. 2, § 7.)
(g) Project - Rolling Hills Well Rehabilitation Project:(i) Project sponsor: Town of Rolling Hills;(ii) Project purpose: Municipal and domestic water supply;(iii) Project description: Rehabilitation of the town's well, transmission pipeline and appurtenances necessary to make the project function in the manner intended;(iv) Total project budget: Two hundred twenty-five thousand dollars ($225,000.00);(v) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred twelve thousand five hundred dollars ($112,500.00) or fifty percent (50%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of seven and one-quarter percent (7.25%);(vi) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred twelve-thousand five hundred dollars ($112,500.00) or fifty percent (50%) of the actual development costs, whichever is less;(vii) Appropriation: There is appropriated from water development account II to the commission two hundred twenty-five thousand dollars ($225,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2004. Source notes for subsection (g): (Laws 2000, Ch. 96, § 1.)
(h) Project - Fayette Irrigation Ditch Rehabilitation:(i) Project sponsor: Fayette Irrigation District;(ii) Project purpose: Irrigation water supply;(iii) Project description: Rehabilitation of an aging conveyance infrastructure including headgates, drop structures, diversions, canals and appurtenances necessary to make the project function in the manner intended;(iv) Total project budget: Seventy-five thousand dollars ($75,000.00);(v) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed thirty-seven thousand five hundred dollars ($37,500.00) or fifty percent (50%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of six percent (6%);(vi) Appropriation: There is appropriated from the water development account II to the commission seventy-five thousand dollars ($75,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2010;(vii) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed thirty-seven thousand five hundred dollars ($37,500.00) or fifty percent (50%) of the actual development costs, whichever is less;(viii) Supplemental project budget: One hundred sixty thousand dollars ($160,000.00);(ix) Supplemental project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission an amount not to exceed one hundred seven thousand two hundred dollars ($107,200.00) or sixty-seven percent (67%) of the additional funds needed to complete the project, whichever is less. Supplemental grant funds may be used for design, construction engineering and construction of the project;(x) Supplemental project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission an amount not to exceed fifty-two thousand eight hundred dollars ($52,800.00) or thirty-three percent (33%) of the additional funds needed to complete the project, whichever is less for a term of twenty-five (25) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%). Supplemental loan funds may be used for design, permit procurement, project land procurement, construction engineering and construction of the project;(xi) Supplemental appropriation: There is appropriated from water development account II to the commission an additional one hundred sixty thousand dollars ($160,000.00), which when combined with the original appropriation, as described in paragraphs (iv) through (vi) of this subsection, total two hundred thirty-five thousand dollars ($235,000.00), or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2010; and(xii) Special supplemental condition: The supplemental appropriation is based upon a different grant and loan ratio than the original appropriation. The original funding described in paragraphs (iv) through (vi) of this subsection shall be expended prior to incurring supplemental funding expenditures. Source notes for subsection (h):