Wyo. Stat. § 99-3-2304

Current through the 2024 legislative session
Section 99-3-2304 - Level III construction projects - rehabilitation
(a) Authorization is granted for the Level III rehabilitation construction projects identified in this section, subject to the general conditions specified in W.S. 99-3-104, provided that the general condition related to repair and maintenance sinking funds as described in W.S. 99-3-104(a)(iii) shall not apply to these projects.

Source Notes for subsection (a): (Laws 2018, Ch. 121, § 1; 2019, Ch. 55, § 2.)

(b) Project - Casper Alcova Irrigation District Underdrain 2018:
(i) Project sponsor: Casper Alcova Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of a replacement underdrain and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Six hundred twenty-two thousand dollars ($622,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred sixteen thousand seven hundred forty dollars ($416,740.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission four hundred sixteen thousand seven hundred forty dollars ($416,740.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023;
(vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

Source Notes for subsection (b): (Laws 2018, Ch. 121, § 1.)

(c) Project - Cottonwood Irrigation District Pipeline Replacement 2018:
(i) Project sponsor: Cottonwood Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of replacement pipelines and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: eight hundred thirty-four thousand dollars ($834,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed five hundred fifty-eight thousand seven hundred eighty dollars ($558,780.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;
(vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred seventy-five thousand two hundred twenty dollars ($275,220.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);
(vii) Appropriation: There is appropriated from water development account II to the commission eight hundred thirty-four thousand dollars ($834,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023.

Source Notes for subsection (c): (Laws 2018, Ch. 121, § 1.)

(d) Project - Deaver Irrigation District Rehabilitation 2018:
(i) Project sponsor: Deaver Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of a replacement flume, lateral improvements and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Four hundred sixty-four thousand dollars ($464,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed two hundred thirty thousand dollars ($230,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission two hundred thirty thousand dollars ($230,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023;
(vii) Special conditions:
(A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and as approved by the commission;
(B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials and bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

Source Notes for subsection (d): (Laws 2018, Ch. 121, § 1.)

(e) Project - Goshen Irrigation District Check Structure 2018:
(i) Project sponsor: Goshen Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of a check structure and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Six hundred ninety-nine thousand dollars ($699,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred sixty-eight thousand three hundred thirty dollars ($468,330.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission four hundred sixty-eight thousand three hundred thirty dollars ($468,330.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023;
(vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

Source Notes for subsection (e): (Laws 2018, Ch. 121, § 1.)

(f) Project - Hanover Irrigation District Cottonwood Spill/Check Replacement 2018:
(i) Project sponsor: Hanover Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of a spill/check structure and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Four hundred fourteen thousand dollars ($414,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred seventy-seven thousand three hundred eighty dollars ($277,380.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;
(vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred thirty-six thousand six hundred twenty dollars ($136,620.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of fifteen (15) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);
(vii) Appropriation: There is appropriated from water development account II to the commission four hundred fourteen thousand dollars ($414,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023.

Source Notes for subsection (f): (Laws 2018, Ch. 121, § 1.)

(g) Project - Heart Mountain Irrigation District Rattlesnake Liner Replacement:
(i) Project sponsor: Heart Mountain Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of a replacement canal liner and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Two million seven hundred thousand dollars ($2,700,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million eight hundred nine thousand dollars ($1,809,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;
(vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed eight hundred ninety-one thousand dollars ($891,000.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of forty (40) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);
(vii) Appropriation: There is appropriated from water development account II to the commission two million seven hundred thousand dollars ($2,700,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023.

Source Notes for subsection (g): (Laws 2018, Ch. 121, § 1.)

(h) Project - Midvale Irrigation District Rehabilitation 2018:
(i) Project sponsor: Midvale Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of lateral pipelines and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: one million four hundred ninety thousand dollars ($1,490,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed nine hundred ninety-five thousand dollars ($995,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission nine hundred ninety-five thousand dollars ($995,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023;
(vii) Special conditions:
(A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and as approved by the commission;
(B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials and bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

Source Notes for subsection (h): (Laws 2018, Ch. 121, § 1.)

(j) Project - Riverton Valley Irrigation District Rehabilitation 2018:
(i) Project sponsor: Riverton Valley Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of canal rehabilitation and restoration, and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: Two million one hundred seventy thousand dollars ($2,170,000.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed five hundred forty-two thousand five hundred dollars ($542,500.00) or twenty-five percent (25%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission five hundred forty-two thousand five hundred dollars ($542,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2025;
(vii) Special conditions: The sponsor is responsible for acquiring seventy-five percent (75%) of the total project budget from other sources.

Source Notes for subsection (j): (Laws 2018, Ch. 121, § 1, 2023, Ch. 180, § 2.)

(k) Project - Sidon Irrigation District Rehabilitation 2018:
(i) Project sponsor: Sidon Irrigation District;
(ii) Project purpose: Agricultural water supply;
(iii) Project description: Design and construction of lateral pipelines and appurtenances necessary to make the project function in the manner intended;
(iv) Total project budget: One million three hundred twenty-one thousand two hundred thirty dollars ($1,321,230.00);
(v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed eight hundred twenty-three thousand dollars ($823,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;
(vi) Appropriation: There is appropriated from water development account II to the commission eight hundred twenty-three thousand dollars ($823,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2023;
(vii) Special conditions:
(A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and as approved by the commission;
(B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials and bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

W.S. 99-3-2304

Amended by Laws 2023, ch. 180,§ 2, eff. 3/10/2023.
Amended by Laws 2019 , ch. 55, § 2, eff. 2/18/2019.
Added by Laws 2018 , ch. 121, § 1, eff. 3/14/2018.