Current through the 2024 Budget Session
Section 41-3-935 - Adjudication procedure(a) Any person constructing any well under a permit shall, within thirty (30) days after the completion or abandonment of such work, report to the state engineer the data required relating to such well, on forms furnished by the state engineer. A well shall be considered complete when it is possible to install a pump and pump water. In the case of an artesian well, completion is the time when the drill rig is moved off of the drilling site.(b) Adjudication of all ground water rights except stock watering and domestic uses of ground water referenced in W.S. 41-3-907 shall proceed upon completion of the work according to the terms of the permit and the recording on forms furnished by the state engineer of such information as is deemed necessary concerning the works, and the filing of a map signed by a Wyoming licensed professional engineer or land surveyor, showing the location of the well and the point or points of use. The state engineer or his authorized representative shall inspect the works, the lands irrigated or other uses being made of the water upon receipt of the map. The adjudication of stock watering and domestic uses of ground water referenced in W.S. 41-3-907 may be initiated by the state engineer or the appropriator of record and will not require the filing of a map signed by a Wyoming licensed professional engineer or land surveyor, showing the location of the well and the points and areas of use or require the inspection by the state engineer or his authorized representative of the works, the lands irrigated or other uses being made of the water unless, in the discretion of the state engineer, such procedures are deemed necessary and appropriate. At this time the board may consider for adjudication the ground water rights upon proof of beneficial use being submitted by the appropriator.(c) Adjudication shall proceed in the same manner prescribed for the adjudication of surface water appropriations once the state engineer or his authorized representative has reported his findings to the board. A ground water appropriation attaches to the land for irrigation, or for such other purposes or object for which it was acquired.(d) In the interest of an orderly adjudication procedure for ground water, the state engineer, with the concurrence of the board, may order adjudication of any ground water appropriations in the state. Upon one (1) year notice, any appropriator whose appropriation is to be adjudicated shall furnish the state engineer all of the documents mentioned in subsection (b) of this section. If any appropriator refuses to supply any of this information, the superintendent may tag and lock the well. Any appropriator that interferes with the tag or lock is subject to the same penalty as provided in W.S. 41-3-938. Use of water well so tagged or locked is prima facie evidence of such interference.