Public agencies shall, prior to the construction or renovation of any major facility, include in the design phase a provision requiring that life-cycle cost analyses be prepared for two (2) or more alternatives for the construction of the facility. These life-cycle cost analyses shall be available to the public. The life-cycle costs shall be a consideration in the selection of a building design by a public agency.
W.S. 16-6-403