A construction defect which is discovered after a claimant has provided a contractor with the original notice of claim is subject to the notice requirements and timetable of this article.
W. Va. Code § 21-11A-17
A construction defect which is discovered after a claimant has provided a contractor with the original notice of claim is subject to the notice requirements and timetable of this article.
W. Va. Code § 21-11A-17