46 U.S.C. § 4705
EDITORIAL NOTES
AMENDMENTS2006- Pub. L. 109-304 in subsec. (a) struck out par. (1) designation before "A barge removal" and substituted "subcontractor are not" for "subcontractor not", redesignated par. (2) as subsec. (b) and subpars. (A) and (B) of former par. (2) as pars. (1) and (2) of subsec. (b), respectively, and substituted "Subsection (a)" for "Paragraph (1)".
- barge removal contractor
- "barge removal contractor" means a person that enters into a contract with the United States to remove an abandoned barge under this chapter.