No expenditures for the construction of any new project, new division of a project, or new supplemental works on a project shall be made, nor shall estimates be submitted therefor, by the Secretary until after he has made an investigation thereof and has submitted to the President and to the Congress his report and findings on-
If the proposed construction is found by the Secretary to have engineering feasibility and if the repayable and returnable allocations to irrigation, power, and municipal water supply or other miscellaneous purposes found by the Secretary to be proper, together with any allocation to flood control or navigation made under subsection (b) of this section, equal the total estimated cost of construction as determined by the Secretary, then the new project, new division of a project, or supplemental works on a project, covered by his findings, shall be deemed authorized and may be undertaken by the Secretary. If all such allocations do not equal said total estimated cost, then said new project, new division, or new supplemental works may be undertaken by the Secretary only after provision therefor has been made by Act of Congress enacted after the Secretary has submitted to the President and the Congress the report and findings involved.
In connection with any new project, new division of a project, or supplemental works on a project there may be allocated to flood control or navigation the part of said total estimated cost which the Secretary may find to be proper. Items for any such allocations made in connection with projects which may be undertaken pursuant to subsection (a) of this section shall be included in the estimates of appropriations submitted by the Secretary for said projects, and funds for such portions of the projects shall not become available except as directly appropriated or allotted to the Department of the Interior. In connection with the making of such an allocation, the Secretary shall consult with the Chief of Engineers and the Secretary of the Army, and may perform any of the necessary investigations or studies under a cooperative agreement with the Secretary of the Army. In the event of such an allocation the Secretary of the Interior shall operate the project for purposes of flood control or navigation, to the extent justified by said allocation therefor.
No water may be delivered for irrigation of lands in connection with any new project, new division of a project, or supplemental works on a project until an organization, satisfactory in form and powers to the Secretary, has entered into a repayment contract with the United States, in a form satisfactory to the Secretary, providing among other things-
In lieu of entering into a repayment contract pursuant to the provisions of subsection (d) of this section to cover that part of the cost of the construction of works connected with water supply and allocated to irrigation, the Secretary, in his discretion, may enter into either short- or long-term contracts to furnish water for irrigation purposes. Each such contract shall be for such period, not to exceed forty years, and at such rates as in the Secretary's judgment will produce revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost and an appropriate share of such fixed charges as the Secretary deems proper, due consideration being given to that part of the cost of construction of works connected with water supply and allocated to irrigation; and shall require payment of said rates each year in advance of delivery of water for said year. In the event such contracts are made for furnishing water for irrigation purposes, the costs of any irrigation water distribution works constructed by the United States in connection with the new project, new division of a project, or supplemental works on a project, shall be covered by a repayment contract entered into pursuant to said subsection (d).
No less than sixty days before entering into or amending any repayment contract or any contract for the delivery of irrigation water (except any contract for the delivery of surplus or interim irrigation water whose duration is for one year or less) the Secretary shall-
1 So in original. Probably should be preceded by "to".
43 U.S.C. § 485h
EDITORIAL NOTES
REFERENCES IN TEXTThe Rural Electrification Act of 1936, referred to in subsec. (c)(1), is act May 20, 1936, ch. 432, 49 Stat. 1363, which is classified generally to chapter 31 (§901 et seq.) of Title 7, Agriculture. For complete classification of this Act to the Code, see section 901 of Title 7 and Tables. The National Environmental Policy Act of 1969, referred to in subsec. (c)(3), is Pub. L. 91-190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables.The Federal Power Act, referred to in subsec. (c)(8), is act June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Act is classified generally to subchapter I (§791a et seq.) of chapter 12 of Title 16, Conservation. For complete classification of this Act to the Code, see section 791a of Title 16 and Tables.Act of September 21, 1959, referred to in subsec. (d)(1), is Pub. L. 86-308, Sept. 21, 1959, 73 Stat. 584, which amended section 485b-1 of this title, enacted provisions set out as a note under section 485b-1 of this title, and amended provisions set out as a note under section 485b of this title. For complete classification of this Act to the Code, see Tables.
AMENDMENTS2021-Subsec. (c)(1). Pub. L. 117-58, §40335(1), in fourth sentence, substituted "and reserve to the Secretary the exclusive authority to develop small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs" for ", including small conduit hydropower development".Subsec. (c)(8). Pub. L. 117-58, §40335(2), substituted "was filed with the Federal Energy Regulatory Commission before August 9, 2013, and is still pending" for "has been filed with the Federal Energy Regulatory Commission as of August 9, 2013". 2013-Subsec. (c). Pub. L. 113-24 designated existing provisions as par. (1) and redesignated former pars. (1) and (2) as subpars. (A) and (B), respectively, of par. (1), substituted "respecting the sales of electric power and leases of power privileges shall be an authorization in addition to and alternative to any authority in existing laws related to particular projects, including small conduit hydropower development" for "respecting the terms of sales of electric power and leases of power privileges shall be in addition and alternative to any authority in existing laws relating to particular projects", and added pars. (2) to (9). 1982-Subsec. (f). Pub. L. 97-293 added subsec. (f).1962-Subsec. (d)(1). Pub. L. 87-613 authorized the Secretary, when a development period of less than ten years was fixed by contract and, before repayment period conditions arose which would justify a longer period, to amend such contract to extend such period to not exceed ten years from its start, and where no period was provided, to grant a period not to exceed ten years, and where he deferred payment of any construction charges pursuant to act of September 21, 1959, authorized him, prior to the due date of the first installment not reduced by such deferment, by agreement with the contracting organization, to terminate the supplemental contract by which such deferment was effected, credit the construction payments made, and exercise the authority granted in this section. 1958-Subsec. (d)(3). Pub. L. 85-611, §1, permitted the general repayment obligation to be spread in annual installments as near to the period of not more than 40 years as is consistent with the adoption and operation of a variable payment formula which permits variance in the required annual payments.Subsec. (d)(5). Pub. L. 85-611, §3, struck out provisions which required repayment contracts to provide that each year the installment of the organization's repayment obligation scheduled for such year shall be the construction charges due and payable for such year, or that each year the installment for such year of the organization's repayment obligation shall be increased or decreased on the basis of the normal and percentages plan provided in former section 485c of this title for modification of existing obligations to pay construction charges, and the amount of the annual installment, as thus increased or decreased, shall be the construction charges due and payable for such year.
STATUTORY NOTES AND RELATED SUBSIDIARIES
CHANGE OF NAMEDepartment of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II, 61 Stat. 501. Section 205(a) of act July 26, 1947, was repealed by section 53 of act Aug. 10, 1956, ch. 1041, 70A Stat. 641. Section 1 of act Aug. 10, 1956, enacted "Title 10, Armed Forces" which in sections 3010 to 3013 continued Department of the Army under administrative supervision of Secretary of the Army.
CONSTRUCTION WITH SECTION 701-1 OF TITLE 33 Section as amended and modified by act Dec. 22, 1944, ch. 665, §1(c), 58 Stat. 665, see section 701-1(c) of Title 33, Navigation and Navigable Waters.
WAGE RATE REQUIREMENTSFor provisions relating to rates of wages to be paid to laborers and mechanics on projects for construction, alteration, or repair work funded under div. D or an amendment by div. D of Pub. L. 117-58 including authority of Secretary of Labor, see section 18851 of Title 42, The Public Health and Welfare.
MUNICIPAL, DOMESTIC, AND INDUSTRIAL WATER SUPPLY CONTRACTS; RENEWALS; CONFORMING AMENDMENTS TO EXISTING CONTRACTS; "LONG-TERM CONTRACT" DEFINEDPub. L. 88-44, June 21, 1963, 77 Stat. 68, provided: "That the Secretary of the Interior shall, upon request of the other party to any long-term contract for municipal, domestic, or industrial water supply hereafter entered into under clause (2) in the proviso to the first sentence of section 9, subsection (c), of the Reclamation Project Act of 1939 (53 Stat. 1195, 43 U.S.C. 485h ), include provision for renewal thereof subject to renegotiation of (1) the charges set forth in the contract in the light of circumstances prevailing at the time of renewal and (2) any other matters with respect to which the right to renegotiate is reserved in the contract. Any right of renewal shall be exercised within such reasonable time prior to the expiration of the contract as the parties shall have agreed upon and set forth therein."SEC. 2. The Secretary shall also, upon like request, provide in any such long-term contract or in any contract entered into under clause (1) of the proviso aforesaid that the other party to the contract shall, during the term of the contract and of any renewal thereof and subject to fulfillment of all obligations thereunder, have a first right for the purposes stated in the contract (to which right the holders of any other type of contract for municipal, domestic, or industrial water supply shall be subordinate) to a stated share or quantity of the project's water supply available for municipal, domestic, or industrial use."SEC. 3. The Secretary is hereby authorized, upon request by the other party, to negotiate amendments to existing contracts entered into pursuant to the first sentence of section 9, subsection (c), of the Reclamation Project Act of 1939 [subsec. (c) of this section] to conform said contracts to the provisions of this Act."SEC. 4. As used in this Act, the term 'long-term contract' means any contract the term of which is more than ten years."
EXTENSION OF VARIABLE PAYMENT PLAN TO OTHER ORGANIZATIONSPub. L. 85-611, §2, Aug. 8, 1958, 72 Stat. 542, provided that: "The benefits of a variable payment plan as provided in the amendment to paragraph (3) of section 9, subsection (d), of the Reclamation Project Act of 1939 [subsec. (d)(3) of this section] contained in section 1 of this Act may be extended by the Secretary to any organization with which he contracts or has contracted for the repayment of construction costs allocated to irrigation on any project undertaken by the United States, including contracts under the Act of August 11, 1939 (53 Stat. 1418), as amended [section 590y et seq. of Title 16, Conservation], and contracts for the storage of water or for the use of stored water under section 8 of the Act of December 22, 1944 (58 Stat. 887, 891) [section 390 of this title]. In the case of any project for which a maximum repayment period longer than that prescribed in said paragraph (3) has been or is allowed by Act of Congress, the period so allowed may be used by the Secretary in lieu of the forty-year period provided in said amendment to paragraph (3)."