43 U.S.C. § 390h-12j

Current through P.L. 118-106 (published on www.congress.gov on 10/04/2024)
Section 390h-12j - Orange County Regional Water Reclamation Project
(a) Authorization

The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the Orange County Regional Water Reclamation Project, to reclaim and reuse water within the service area of the Orange County Water District in California.

(b) Cost share

The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.

(c) Limitation

The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).

43 U.S.C. § 390h-12j

Pub. L. 102-575, title XVI, §1624, as added Pub. L. 104-266, §2(a)(2), Oct. 9, 1996, 110 Stat. 3292; amended Pub. L. 111-11, title IX, §9111(c), Mar. 30, 2009, 123 Stat. 1318.

EDITORIAL NOTES

AMENDMENTS2009- Pub. L. 111-11, §9111(c)(1), struck out "Phase 1 of the" before "Orange County" in section catchline.Subsec. (a). Pub. L. 111-11, §9111(c)(2), struck out "phase 1 of" before "the Orange County".