(a) Impairment of visibility; list of areas; study and report(1) Congress hereby declares as a national goal the prevention of any future, and the remedying of any existing, impairment of visibility in mandatory class I Federal areas which impairment results from manmade air pollution.(2) Not later than six months after August 7, 1977, the Secretary of the Interior in consultation with other Federal land managers shall review all mandatory class I Federal areas and identify those where visibility is an important value of the area. From time to time the Secretary of the Interior may revise such identifications. Not later than one year after August 7, 1977, the Administrator shall, after consultation with the Secretary of the Interior, promulgate a list of mandatory class I Federal areas in which he determines visibility is an important value.(3) Not later than eighteen months after August 7, 1977, the Administrator shall complete a study and report to Congress on available methods for implementing the national goal set forth in paragraph (1). Such report shall include recommendations for-(A) methods for identifying, characterizing, determining, quantifying, and measuring visibility impairment in Federal areas referred to in paragraph (1), and(B) modeling techniques (or other methods) for determining the extent to which manmade air pollution may reasonably be anticipated to cause or contribute to such impairment, and(C) methods for preventing and remedying such manmade air pollution and resulting visibility impairment.Such report shall also identify the classes or categories of sources and the types of air pollutants which, alone or in conjunction with other sources or pollutants, may reasonably be anticipated to cause or contribute significantly to impairment of visibility.
(4) Not later than twenty-four months after August 7, 1977, and after notice and public hearing, the Administrator shall promulgate regulations to assure (A) reasonable progress toward meeting the national goal specified in paragraph (1), and (B) compliance with the requirements of this section.(b) RegulationsRegulations under subsection (a)(4) shall-
(1) provide guidelines to the States, taking into account the recommendations under subsection (a)(3) on appropriate techniques and methods for implementing this section (as provided in subparagraphs (A) through (C) of such subsection (a)(3)), and(2) require each applicable implementation plan for a State in which any area listed by the Administrator under subsection (a)(2) is located (or for a State the emissions from which may reasonably be anticipated to cause or contribute to any impairment of visibility in any such area) to contain such emission limits, schedules of compliance and other measures as may be necessary to make reasonable progress toward meeting the national goal specified in subsection (a), including-(A) except as otherwise provided pursuant to subsection (c), a requirement that each major stationary source which is in existence on August 7, 1977, but which has not been in operation for more than fifteen years as of such date, and which, as determined by the State (or the Administrator in the case of a plan promulgated under section 7410(c) of this title) emits any air pollutant which may reasonably be anticipated to cause or contribute to any impairment of visibility in any such area, shall procure, install, and operate, as expeditiously as practicable (and maintain thereafter) the best available retrofit technology, as determined by the State (or the Administrator in the case of a plan promulgated under section 7410(c) of this title) for controlling emissions from such source for the purpose of eliminating or reducing any such impairment, and(B) a long-term (ten to fifteen years) strategy for making reasonable progress toward meeting the national goal specified in subsection (a).In the case of a fossil-fuel fired generating powerplant having a total generating capacity in excess of 750 megawatts, the emission limitations required under this paragraph shall be determined pursuant to guidelines, promulgated by the Administrator under paragraph (1).
(c) Exemptions(1) The Administrator may, by rule, after notice and opportunity for public hearing, exempt any major stationary source from the requirement of subsection (b)(2)(A), upon his determination that such source does not or will not, by itself or in combination with other sources, emit any air pollutant which may reasonably be anticipated to cause or contribute to a significant impairment of visibility in any mandatory class I Federal area.(2) Paragraph (1) of this subsection shall not be applicable to any fossil-fuel fired powerplant with total design capacity of 750 megawatts or more, unless the owner or operator of any such plant demonstrates to the satisfaction of the Administrator that such powerplant is located at such distance from all areas listed by the Administrator under subsection (a)(2) that such powerplant does not or will not, by itself or in combination with other sources, emit any air pollutant which may reasonably be anticipated to cause or contribute to significant impairment of visibility in any such area.(3) An exemption under this subsection shall be effective only upon concurrence by the appropriate Federal land manager or managers with the Administrator's determination under this subsection.(d) Consultations with appropriate Federal land managersBefore holding the public hearing on the proposed revision of an applicable implementation plan to meet the requirements of this section, the State (or the Administrator, in the case of a plan promulgated under section 7410(c) of this title) shall consult in person with the appropriate Federal land manager or managers and shall include a summary of the conclusions and recommendations of the Federal land managers in the notice to the public.
(e) Buffer zonesIn promulgating regulations under this section, the Administrator shall not require the use of any automatic or uniform buffer zone or zones.
(f) Nondiscretionary dutyFor purposes of section 7604(a)(2) of this title, the meeting of the national goal specified in subsection (a)(1) by any specific date or dates shall not be considered a "nondiscretionary duty" of the Administrator.
(g) DefinitionsFor the purpose of this section-
(1) in determining reasonable progress there shall be taken into consideration the costs of compliance, the time necessary for compliance, and the energy and nonair quality environmental impacts of compliance, and the remaining useful life of any existing source subject to such requirements;(2) in determining best available retrofit technology the State (or the Administrator in determining emission limitations which reflect such technology) shall take into consideration the costs of compliance, the energy and nonair quality environmental impacts of compliance, any existing pollution control technology in use at the source, the remaining useful life of the source, and the degree of improvement in visibility which may reasonably be anticipated to result from the use of such technology;(3) the term "manmade air pollution" means air pollution which results directly or indirectly from human activities;(4) the term "as expeditiously as practicable" means as expeditiously as practicable but in no event later than five years after the date of approval of a plan revision under this section (or the date of promulgation of such a plan revision in the case of action by the Administrator under section 7410(c) of this title for purposes of this section);(5) the term "mandatory class I Federal areas" means Federal areas which may not be designated as other than class I under this part;(6) the terms "visibility impairment" and "impairment of visibility" shall include reduction in visual range and atmospheric discoloration; and(7) the term "major stationary source" means the following types of stationary sources with the potential to emit 250 tons or more of any pollutant: fossil-fuel fired steam electric plants of more than 250 million British thermal units per hour heat input, coal cleaning plants (thermal dryers), kraft pulp mills, Portland Cement plants, primary zinc smelters, iron and steel mill plants, primary aluminum ore reduction plants, primary copper smelters, municipal incinerators capable of charging more than 250 tons of refuse per day, hydrofluoric, sulfuric, and nitric acid plants, petroleum refineries, lime plants, phosphate rock processing plants, coke oven batteries, sulfur recovery plants, carbon black plants (furnace process), primary lead smelters, fuel conversion plants, sintering plants, secondary metal production facilities, chemical process plants, fossil-fuel boilers of more than 250 million British thermal units per hour heat input, petroleum storage and transfer facilities with a capacity exceeding 300,000 barrels, taconite ore processing facilities, glass fiber processing plants, charcoal production facilities.July 14, 1955, ch. 360, title I, §169A, as added Pub. L. 95-95, title I, §128, Aug. 7, 1977, 91 Stat. 742.STATUTORY NOTES AND RELATED SUBSIDIARIES
EFFECTIVE DATESubpart effective Aug. 7, 1977, except as otherwise expressly provided, see section 406(d) of Pub. L. 95-95 set out as an Effective Date of 1977 Amendment note under section 7401 of this title.