No appropriation shall be made to the Commission, nor shall the Commission waive charges for the use of materials under the Cooperative Power Reactor Demonstration Program, unless previously authorized by legislation enacted by the Congress.
Any Act appropriating funds to the Commission may appropriate specified portions thereof to be accounted for upon the certification of the Commission only.
Notwithstanding the provisions of subsection (a), funds are hereby authorized to be appropriated for the restoration or replacement of any plant or facility destroyed or otherwise seriously damaged, and the Commission is authorized to use available funds for such purposes.
Funds authorized to be appropriated for any construction project to be used in connection with the development or production of special nuclear material or atomic weapons may be used to start another construction project not otherwise authorized if the substituted construction project is within the limit of cost of the construction project for which substitution is to be made, and the Commission certifies that-
42 U.S.C. § 2017
EDITORIAL NOTES
PRIOR PROVISIONSProvisions similar to those comprising this section were contained in section 19 of act Aug. 1, 1946, ch. 724, 60 Stat. 775, which was classified to section 1819 of this title, prior to the general amendment and renumbering of act Aug. 1, 1946, by act Aug. 30, 1954.
AMENDMENTS1963-Subsec. (a). Pub. L. 88-72 required legislative authorization of appropriations to the Commission and waiver of charges for use of materials under the Cooperative Power Reactor Demonstration Program. Former provisions of subsec. (a) authorized appropriations necessary and appropriate to carry out the provisions and purposes of this chapter, excepting in par. (1) sums necessary for acquisition of real property or facility acquisition, construction or expansion (and deeming under certain conditions a nonmilitary experimental reactor to be a facility) and in par. (2) sums necessary to carry out cooperative programs for development and construction of reactors for demonstration of their use in production of electrical power or process heat, or for propulsion, or for commercial provision of byproduct material, irradiation or other special service, for civilian use, by arrangements providing for payment of funds, rendering of services and undertaking of research and development without full reimbursement, the waiver of charges accompanying such arrangement or the provision of other financial assistance pursuant to such arrangement or the acquisition of real property or facility acquisition, construction or expansion undertaken by the Commission as part of such arrangement.Subsec. (b). Pub. L. 88-72 substituted "Any act appropriating funds to the Commission" for "The acts appropriating such sums." Subsec. (c). Pub. L. 88-72 struck out authorization of funds provision for advance planning, construction design and architectural services in connection with any plant or facility and inserted "Notwithstanding" phrase.Subsec. (d). Pub. L. 88-72 struck out "hereafter" after "Funds" and inserted "construction" before "project" wherever appearing. 1962-Subsecs. (c), (d). Pub. L. 87-615 added subsecs. (c) and (d). 1957- Pub. L. 85-79 designated first sentence as introductory clause of subsec. (a) and as (a)(1), inserted proviso to (a)(1), added (a)(2), by designating second sentence as subsec. (b), and struck out former sentence which provided that "Funds appropriated to the Commission shall, if obligated by contract during the fiscal year for which appropriated, remain available for expenditure for four years following the expiration of the fiscal year for which appropriated.".
STATUTORY NOTES AND RELATED SUBSIDIARIES
EFFECTIVE DATE OF 1963 AMENDMENT Pub. L. 88-72, §107, July 22, 1963, 77 Stat. 88, provided that the amendment made by that section is effective Jan. 1, 1964.
- project
- The terms "federally assisted housing" and "project" mean-(A) a public housing project (as such term is defined in section 3(b) of the United States Housing Act of 1937 [42 U.S.C. 1437a(b)] );(B) housing for which project-based assistance is provided under section 8 of the United States Housing Act of 1937 [42 U.S.C. 1437f] ;(C) housing that is assisted under section 1701q of title 12;(D) housing that is assisted under section 1701q of title 12, as such section existed before November 28, 1990;(E) housing financed by a loan or mortgage insured under section 1715l(d)(3) of title 12 that bears interest at a rate determined under the proviso of section 1715l(d)(5) of title 12;(F) housing insured, assisted, or held by the Secretary or a State or State agency under section 1715z-1 of title 12;(G) housing constructed or substantially rehabilitated pursuant to assistance provided under section 8(b)(2) of the United States Housing Act of 1937 [42 U.S.C. 1437f(b)(2)], as in effect before October 1, 1983, that is assisted under a contract for assistance under such section; and(H) housing that is assisted under section 8013 1 of this title.