The Secretary of the Army, acting through the Chief of Engineers, is authorized and directed to conduct a study of the most efficient methods of utilizing the hydroelectric power resources at water resource development projects under the jurisdiction of the Secretary of the Army and to prepare a plan based upon the findings of such study. Such study shall include, but not be limited to, an analysis of-
Within three years after the date of the first appropriation of funds for the purpose of carrying out this section, the Secretary of the Army, acting through the Chief of Engineers, shall transmit the plan prepared pursuant to subsection (a) with supporting studies and documentation, together with the recommendations of the Secretary and the Chief of Engineers on such plan, to the Committee on Environment and Public Works of the Senate and the Committee on Public Works and Transportation of the House of Representatives.
There is authorized to be appropriated to carry out subsections (a) and (b) of this section not to exceed $7,000,000.
The Secretary of the Army, acting through the Chief of Engineers, is authorized with respect to previously authorized projects to undertake feasibility studies of specific hydroelectric power installations that are identified in the course of the study authorized by this section, as having high potential for contribution toward meeting regional power needs. There is authorized to be appropriated to carry out this subsection not to exceed $5,000,000 per fiscal year for each of the fiscal years 1978 and 1979.
42 U.S.C. § 1962d-5g
EDITORIAL NOTES
CODIFICATIONSection was enacted as part of the Water Resources Development Act of 1976, and not as part of the Water Resources Planning Act which comprises this chapter.
AMENDMENTS1994-Subsec. (b). Pub. L. 103-437 substituted "Committee on Environment and Public Works of the Senate" for "Committee on Public Works of the Senate".
STATUTORY NOTES AND RELATED SUBSIDIARIES
CHANGE OF NAMECommittee on Public Works and Transportation of House of Representatives treated as referring to Committee on Transportation and Infrastructure of House of Representatives by section 1(a) of Pub. L. 104-14 set out as a note preceding section 21 of Title 2, The Congress.
FEDERAL HYDROELECTRIC POWER MODERNIZATION STUDYPub. L. 100-676, §42, Nov. 17, 1988, 102 Stat. 4040, directed Secretary to conduct a study of need to modernize and upgrade federally owned and operated hydroelectric power system, and to submit a report, along with recommendations, to Congress not later than 2 years after Nov. 17, 1988.
WATER QUALITY EFFECTS OF HYDROELECTRIC FACILITIESPub. L. 100-676, §43, Nov. 17, 1988, 102 Stat. 4040, directed Secretary, in cooperation with Administrator of Environmental Protection Agency, to undertake a study of water quality effects of hydroelectric facilities owned and operated by Corps of Engineers, which was to be transmitted to Congress within 2 years of Nov. 17, 1988, and was to consider and include information for each such Corps of Engineers hydroelectric facility pertaining to: relevant water quality standards including dissolved oxygen; water quality monitoring data; possible options and projected costs of measures required to improve the quality of water released from each such facility where justified; and recommendations with respect to such study results.
- Administrator
- The term "Administrator" means the Administrator of General Services.
- Secretary
- The term "Secretary" means the Secretary of Housing and Urban Development.1 See References in Text note below.