42 U.S.C. § 10244

Current through P.L. 118-107 (published on www.congress.gov on 11/21/2024)
Section 10244 - Environmental assessment of sites
(a) In general

Upon the request of the Negotiator, the Secretary shall prepare an environmental assessment of any site that is the subject of negotiations under section 10243(a) of this title.

(b) Contents
(1) Each environmental assessment prepared for a repository site shall include a detailed statement of the probable impacts of characterizing such site and the construction and operation of a repository at such site.
(2) Each environmental assessment prepared for a monitored retrievable storage facility site shall include a detailed statement of the probable impacts of construction and operation of such a facility at such site.
(c) Judicial review

The issuance of an environmental assessment under subsection (a) shall be considered to be a final agency action subject to judicial review in accordance with the provisions of chapter 7 of title 5 and section 10139 of this title.

(d) Public hearings
(1) In preparing an environmental assessment for any repository or monitored retrievable storage facility site, the Secretary shall hold public hearings in the vicinity of such site to inform the residents of the area in which such site is located that such site is being considered and to receive their comments.
(2) At such hearings, the Secretary shall solicit and receive any recommendations of such residents with respect to issues that should be addressed in the environmental assessment required under subsection (a) and the site characterization plan described in section 10133(b)(1) of this title.
(e) Public availability

Each environmental assessment prepared under subsection (a) shall be made available to the public.

(f) Evaluation of sites
(1) In preparing an environmental assessment under subsection (a), the Secretary shall use available geophysical, geologic, geochemical and hydrologic, and other information and shall not conduct any preliminary borings or excavations at any site that is the subject of such assessment unless-
(A) such preliminary boring or excavation activities were in progress on or before December 22, 1987; or
(B) the Secretary certifies that, in the absence of preliminary borings or excavations, adequate information will not be available to satisfy the requirements of this chapter or any other law.
(2) No preliminary boring or excavation conducted under this section shall exceed a diameter of 40 inches.

42 U.S.C. § 10244

Pub. L. 97-425, title IV, §404, as added Pub. L. 100-202, §101(d) [title III], Dec. 22, 1987, 101 Stat. 1329-104, 1329-121; Pub. L. 100-203, title V, §5041, Dec. 22, 1987, 101 Stat. 1330-245.

EDITORIAL NOTES

CODIFICATION Pub. L. 100-202 and Pub. L. 100-203 added identical sections.

Negotiator
The term "Negotiator" means the Nuclear Waste Negotiator.
Secretary
The term "Secretary" means the Secretary of Energy.
monitored retrievable storage facility
The term "monitored retrievable storage facility" means the storage facility described in section 10161(b)(1) of this title.1 So in original. The semicolon probably should be a period.2 See References in Text note below.
repository
The term "repository" means any system licensed by the Commission that is intended to be used for, or may be used for, the permanent deep geologic disposal of high-level radioactive waste and spent nuclear fuel, whether or not such system is designed to permit the recovery, for a limited period during initial operation, of any materials placed in such system. Such term includes both surface and subsurface areas at which high-level radioactive waste and spent nuclear fuel handling activities are conducted.
site characterization
The term "site characterization" means-(A) siting research activities with respect to a test and evaluation facility at a candidate site; and(B) activities, whether in the laboratory or in the field, undertaken to establish the geologic condition and the ranges of the parameters of a candidate site relevant to the location of a repository, including borings, surface excavations, excavations of exploratory shafts, limited subsurface lateral excavations and borings, and in situ testing needed to evaluate the suitability of a candidate site for the location of a repository, but not including preliminary borings and geophysical testing needed to assess whether site characterization should be undertaken.