42 U.S.C. § 10225

Current through P.L. 118-107 (published on www.congress.gov on 11/21/2024)
Section 10225 - Location of test and evaluation facility
(a) Report to Congress

Not later than 1 year after January 7, 1983, the Secretary shall transmit to the Congress a report setting forth whether the Secretary plans to locate the test and evaluation facility at the site of a repository.

(b) Procedures
(1) If the test and evaluation facility is to be located at any candidate site or repository site (A) site selection and development of such facility shall be conducted in accordance with the procedures and requirements established in subchapter I with respect to the site selection and development of repositories; and (B) the Secretary may not commence construction of any surface facility for such test and evaluation facility prior to issuance by the Commission of a construction authorization for a repository at the site involved.
(2) No test and evaluation facility may be converted into a repository unless site selection and development of such facility was conducted in accordance with the procedures and requirements established in subchapter I with respect to the site selection and development of respositories.1
(3) The Secretary may not commence construction of a test and evaluation facility at a candidate site or site recommended as the location for a repository prior to the date on which the designation of such site is effective under section 10135 of this title.

1 So in original. Probably should be "repositories."

42 U.S.C. § 10225

Pub. L. 97-425, title III, §305, Jan. 7, 1983, 96 Stat. 2262.
Commission
The term "Commission" means the Nuclear Regulatory Commission.
Secretary
The term "Secretary" means the Secretary of Energy.
candidate site
The term "candidate site" means an area, within a geologic and hydrologic system, that is recommended by the Secretary under section 10132 of this title for site characterization, approved by the President under section 10132 of this title for site characterization, or undergoing site characterization under section 10133 of this title.
repository
The term "repository" means any system licensed by the Commission that is intended to be used for, or may be used for, the permanent deep geologic disposal of high-level radioactive waste and spent nuclear fuel, whether or not such system is designed to permit the recovery, for a limited period during initial operation, of any materials placed in such system. Such term includes both surface and subsurface areas at which high-level radioactive waste and spent nuclear fuel handling activities are conducted.
test and evaluation facility
The term "test and evaluation facility" means an at-depth, prototypic, underground cavity with subsurface lateral excavations extending from a central shaft that is used for research and development purposes, including the development of data and experience for the safe handling and disposal of solidified high-level radioactive waste, transuranic waste, or spent nuclear fuel.