In any Commission hearing under section 189 of the Atomic Energy Act of 1954 (42 U.S.C. 2239) on an application for a license, or for an amendment to an existing license, filed after January 7, 1983, to expand the spent nuclear fuel storage capacity at the site of a civilian nuclear power reactor, through the use of high-density fuel storage racks, fuel rod compaction, the transshipment of spent nuclear fuel to another civilian nuclear power reactor within the same utility system, the construction of additional spent nuclear fuel pool capacity or dry storage capacity, or by other means, the Commission shall, at the request of any party, provide an opportunity for oral argument with respect to any matter which the Commission determines to be in controversy among the parties. The oral argument shall be preceded by such discovery procedures as the rules of the Commission shall provide. The Commission shall require each party, including the Commission staff, to submit in written form, at the time of the oral argument, a summary of the facts, data, and arguments upon which such party proposes to rely that are known at such time to such party. Only facts and data in the form of sworn testimony or written submission may be relied upon by the parties during oral argument. Of the materials that may be submitted by the parties during oral argument, the Commission shall only consider those facts and data that are submitted in the form of sworn testimony or written submission.
No court shall hold unlawful or set aside a decision of the Commission in any proceeding described in subsection (a) because of a failure by the Commission to use a particular procedure pursuant to this section unless-
42 U.S.C. § 10154
EDITORIAL NOTES
REFERENCES IN TEXTThe Atomic Energy Act of 1954, referred to in subsec. (b)(3), is act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, §1, 68 Stat. 919, which is classified principally to chapter 23 (§2011 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 2011 of this title and Tables.
- Commission
- The term "Commission" means the Nuclear Regulatory Commission.
- civilian nuclear power reactor
- The term "civilian nuclear power reactor" means a civilian nuclear powerplant required to be licensed under section 2133 or 2134(b) of this title.
- spent nuclear fuel
- The term "spent nuclear fuel" means fuel that has been withdrawn from a nuclear reactor following irradiation, the constituent elements of which have not been separated by reprocessing.
- storage
- The term "storage" means retention of high-level radioactive waste, spent nuclear fuel, or transuranic waste with the intent to recover such waste or fuel for subsequent use, processing, or disposal.