The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection.
Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary (1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343(c) of this title, and (2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage.
The Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the Administrator shall consult with the Secretary. The Administrator shall set forth in writing and make public his findings and his reasons for making any determination under this subsection.
The term "Secretary" as used in this section means the Secretary of the Army, acting through the Chief of Engineers.
is not prohibited by or otherwise subject to regulation under this section or section 1311(a) or 1342 of this title (except for effluent standards or prohibitions under section 1317 of this title).
Whenever the Administrator determines after public hearing that a State is not administering a program approved under subsection (h)(2)(A) of this section, in accordance with this section, including, but not limited to, the guidelines established under subsection (b)(1) of this section, the Administrator shall so notify the State, and, if appropriate corrective action is not taken within a reasonable time, not to exceed ninety days after the date of the receipt of such notification, the Administrator shall (1) withdraw approval of such program until the Administrator determines such corrective action has been taken, and (2) notify the Secretary that the Secretary shall resume the program for the issuance of permits under subsections (a) and (e) of this section for activities with respect to which the State was issuing permits and that such authority of the Secretary shall continue in effect until such time as the Administrator makes the determination described in clause (1) of this subsection and such State again has an approved program.
Each State which is administering a permit program pursuant to this section shall transmit to the Administrator (1) a copy of each permit application received by such State and provide notice to the Administrator of every action related to the consideration of such permit application, including each permit proposed to be issued by such State, and (2) a copy of each proposed general permit which such State intends to issue. Not later than the tenth day after the date of the receipt of such permit application or such proposed general permit, the Administrator shall provide copies of such permit application or such proposed general permit to the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service. If the Administrator intends to provide written comments to such State with respect to such permit application or such proposed general permit, he shall so notify such State not later than the thirtieth day after the date of the receipt of such application or such proposed general permit and provide such written comments to such State, after consideration of any comments made in writing with respect to such application or such proposed general permit by the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, not later than the ninetieth day after the date of such receipt. If such State is so notified by the Administrator, it shall not issue the proposed permit until after the receipt of such comments from the Administrator, or after such ninetieth day, whichever first occurs. Such State shall not issue such proposed permit after such ninetieth day if it has received such written comments in which the Administrator objects (A) to the issuance of such proposed permit and such proposed permit is one that has been submitted to the Administrator pursuant to subsection (h)(1)(E), or (B) to the issuance of such proposed permit as being outside the requirements of this section, including, but not limited to, the guidelines developed under subsection (b)(1) of this section unless it modifies such proposed permit in accordance with such comments. Whenever the Administrator objects to the issuance of a permit under the preceding sentence such written objection shall contain a statement of the reasons for such objection and the conditions which such permit would include if it were issued by the Administrator. In any case where the Administrator objects to the issuance of a permit, on request of the State, a public hearing shall be held by the Administrator on such objection. If the State does not resubmit such permit revised to meet such objection within 30 days after completion of the hearing or, if no hearing is requested within 90 days after the date of such objection, the Secretary may issue the permit pursuant to subsection (a) or (e) of this section, as the case may be, for such source in accordance with the guidelines and requirements of this chapter.
In accordance with guidelines promulgated pursuant to subsection (i)(2) of section 1314 of this title, the Administrator is authorized to waive the requirements of subsection (j) of this section at the time of the approval of a program pursuant to subsection (h)(2)(A) of this section for any category (including any class, type, or size within such category) of discharge within the State submitting such program.
The Administrator shall promulgate regulations establishing categories of discharges which he determines shall not be subject to the requirements of subsection (j) of this section in any State with a program approved pursuant to subsection (h)(2)(A) of this section. The Administrator may distinguish among classes, types, and sizes within any category of discharges.
Not later than the ninetieth day after the date on which the Secretary notifies the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service that (1) an application for a permit under subsection (a) of this section has been received by the Secretary, or (2) the Secretary proposes to issue a general permit under subsection (e) of this section, the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, shall submit any comments with respect to such application or such proposed general permit in writing to the Secretary.
Nothing in this section shall be construed to limit the authority of the Administrator to take action pursuant to section 1319 of this title.
A copy of each permit application and each permit issued under this section shall be available to the public. Such permit application or portion thereof, shall further be available on request for the purpose of reproduction.
Compliance with a permit issued pursuant to this section, including any activity carried out pursuant to a general permit issued under this section, shall be deemed compliance, for purposes of sections 1319 and 1365 of this title, with sections 1311, 1317, and 1343 of this title.
Not later than the one-hundred-eightieth day after December 27, 1977, the Secretary shall enter into agreements with the Administrator, the Secretaries of the Departments of Agriculture, Commerce, Interior, and Transportation, and the heads of other appropriate Federal agencies to minimize, to the maximum extent practicable, duplication, needless paperwork, and delays in the issuance of permits under this section. Such agreements shall be developed to assure that, to the maximum extent practicable, a decision with respect to an application for a permit under subsection (a) of this section will be made not later than the ninetieth day after the date the notice for such application is published under subsection (a) of this section.
The discharge of dredged or fill material as part of the construction of a Federal project specifically authorized by Congress, whether prior to or on or after December 27, 1977, is not prohibited by or otherwise subject to regulation under this section, or a State program approved under this section, or section 1311(a) or 1342 of this title (except for effluent standards or prohibitions under section 1317 of this title), if information on the effects of such discharge, including consideration of the guidelines developed under subsection (b)(1) of this section, is included in an environmental impact statement for such project pursuant to the National Environmental Policy Act of 1969 [ 42 U.S.C. 4321 et seq.] and such environmental impact statement has been submitted to Congress before the actual discharge of dredged or fill material in connection with the construction of such project and prior to either authorization of such project or an appropriation of funds for such construction.
Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation.
1 So in original. Probably should be "action".
33 U.S.C. § 1344
EDITORIAL NOTES
REFERENCES IN TEXTThe National Environmental Policy Act of 1969, referred to in subsec. (r), is Pub. L. 91-190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables.
AMENDMENTS1987-Subsec. (s). Pub. L. 100-4 redesignated par. (5) as (4), substituted "$25,000 per day for each violation" for "$10,000 per day of such violation", inserted provision specifying factors to consider in determining the penalty amount, and struck out former par. (4) which read as follows:"(A) Any person who willfully or negligently violates any condition or limitation in a permit issued by the Secretary under this section shall be punished by a fine of not less than $2,500 nor more than $25,000 per day of violation, or by imprisonment for not more than one year, or by both. If the conviction is for a violation committed after a first conviction of such person under this paragraph, punishment shall be by a fine of not more than $50,000 per day of violation, or by imprisonment for not more than two years, or by both."(B) For the purposes of this paragraph, the term 'person' shall mean, in addition to the definition contained in section 1362(5) of this title, any responsible corporate officer."1977-Subsec. (a). Pub. L. 95-217, §67(a)(1), substituted "The Secretary" for "The Secretary of the Army, acting through the Chief of Engineers," and inserted provision that, not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary publish the notice required by this subsection. Subsecs. (b), (c). Pub. L. 95-217, §67(a)(2), substituted "the Secretary" for "the Secretary of the Army".Subsecs. (d) to (t). Pub. L. 95-217, §67(b), added subsecs. (d) to (t).
STATUTORY NOTES AND RELATED SUBSIDIARIES
TRANSFER OF FUNCTIONSFor transfer of authorities, functions, personnel, and assets of the Coast Guard, including the authorities and functions of the Secretary of Transportation relating thereto, to the Department of Homeland Security, and for treatment of related references, see sections 468(b), 551(d), 552(d),and 557 of Title 6, Domestic Security, and the Department of Homeland Security Reorganization Plan of November 25, 2002, as modified, set out as a note under section 542 of Title 6.
MAINTENANCE DREDGING PERMITS Pub. L. 117-263, div. H, title LXXXI, §81268126,, 136 Stat. 3715, provided that:"(a) IN GENERAL.-The Secretary [of the Army] shall, to the maximum extent practicable, prioritize the reissuance of any regional general permit for maintenance dredging under section 404 of the Federal Water Pollution Control Act ( 33 U.S.C. 1344 ) that expired prior to May 1, 2021."(b) SAVINGS PROVISION.-Nothing in this section affects any obligation to comply with the provisions of any Federal or State environmental law, including-"(1) the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 et seq.);"(2) the Federal Water Pollution Control Act ( 33 U.S.C. 1251 et seq.); and "(3) the Endangered Species Act of 1973 ( 16 U.S.C. 1531 et seq.)."
MITIGATION AND MITIGATION BANKING REGULATIONS Pub. L. 108-136, div. A, title III, §314(b), Nov. 24, 2003, 117 Stat. 1431, provided that:"(1) To ensure opportunities for Federal agency participation in mitigation banking, the Secretary of the Army, acting through the Chief of Engineers, shall issue regulations establishing performance standards and criteria for the use, consistent with section 404 of the Federal Water Pollution Control Act ( 33 U.S.C. 1344 ), of on-site, off-site, and in-lieu fee mitigation and mitigation banking as compensation for lost wetlands functions in permits issued by the Secretary of the Army under such section. To the maximum extent practicable, the regulatory standards and criteria shall maximize available credits and opportunities for mitigation, provide flexibility for regional variations in wetland conditions, functions and values, and apply equivalent standards and criteria to each type of compensatory mitigation."(2) Final regulations shall be issued not later than two years after the date of the enactment of this Act [Nov. 24, 2003]."
REGULATORY PROGRAM Pub. L. 106-377, §1(a)(2) [title I], Oct. 27, 2000, 114 Stat. 1441, 1441A-63, provided in part that: "For expenses necessary for administration of laws pertaining to regulation of navigable waters and wetlands, $125,000,000, to remain available until expended: Provided, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated herein to: (1) by March 1, 2001, supplement the report, Cost Analysis For the 1999 Proposal to Issue and Modify Nationwide Permits, to reflect the Nationwide Permits actually issued on March 9, 2000, including changes in the acreage limits, preconstruction notification requirements and general conditions between the rule proposed on July 21, 1999, and the rule promulgated and published in the Federal Register; (2) after consideration of the cost analysis for the 1999 proposal to issue and modify nationwide permits and the supplement prepared pursuant to this Act [H.R. 5483, as enacted by section 1(a)(2) of Pub. L. 106-377 see Tables for classification] and by September 30, 2001, prepare, submit to Congress and publish in the Federal Register a Permit Processing Management Plan by which the Corps of Engineers will handle the additional work associated with all projected increases in the number of individual permit applications and preconstruction notifications related to the new and replacement permits and general conditions. The Permit Processing Management Plan shall include specific objective goals and criteria by which the Corps of Engineers' progress towards reducing any permit backlog can be measured; (3) beginning on December 31, 2001, and on a biannual basis thereafter, report to Congress and publish in the Federal Register, an analysis of the performance of its program as measured against the criteria set out in the Permit Processing Management Plan; (4) implement a 1-year pilot program to publish quarterly on the U.S. Army Corps of Engineer's Regulatory Program website all Regulatory Analysis and Management Systems (RAMS) data for the South Pacific Division and North Atlantic Division beginning within 30 days of the enactment of this Act [Oct. 27, 2000]; and (5) publish in Division Office websites all findings, rulings, and decisions rendered under the administrative appeals process for the Corps of Engineers Regulatory Program as established in Public Law 106-60 [113 Stat. 486]: Provided further, That, through the period ending on September 30, 2003, the Corps of Engineers shall allow any appellant to keep a verbatim record of the proceedings of the appeals conference under the aforementioned administrative appeals process: Provided further, That within 30 days of the enactment of this Act, the Secretary of the Army, acting through the Chief of Engineers, shall require all U.S. Army Corps of Engineers Divisions and Districts to record the date on which a section 404 individual permit application or nationwide permit notification is filed with the Corps of Engineers: Provided further, That the Corps of Engineers, when reporting permit processing times, shall track both the date a permit application is first received and the date the application is considered complete, as well as the reason that the application is not considered complete upon first submission."
AUTHORITY TO DELEGATE TO STATE OF WASHINGTON FUNCTIONS OF THE SECRETARY RELATING TO LAKE CHELAN, WASHINGTON Pub. L. 95-217, §76, Dec. 27, 1977, 91 Stat. 1610, provided that: "The Secretary of the Army, acting through the Chief of Engineers, is authorized to delegate to the State of Washington upon its request all or any part of those functions vested in such Secretary by section 404 of the Federal Water Pollution Control Act [this section] and by sections 9, 10, and 13 of the Act of March 3, 1899 [sections 401, 403, and 407 of this title], relating to Lake Chelan, Washington, if the Secretary determines (1) that such State has the authority, responsibility, and capability to carry out such functions, and (2) that such delegation is in the public interest. Such delegation shall be subject to such terms and conditions as the Secretary deems necessary, including, but not limited to, suspension and revocation for cause of such delegation."
DREDGED MATERIAL DISPOSAL Pub. L. 114-322, title I, §11891189,, 130 Stat. 1681, provided that: "Disposal of dredged material shall not be considered environmentally acceptable for the purposes of identifying the Federal standard (as defined in section 335.7 of title 33, Code of Federal Regulations (or successor regulations)) if the disposal violates applicable State water quality standards approved by the Administrator of the Environmental Protection Agency under section 303 of the Federal Water Pollution Control Act ( 33 U.S.C. 1313 )."
EXECUTIVE DOCUMENTS
TRANSFER OF FUNCTIONS Enforcement functions of Administrator or other official of the Environmental Protection Agency and of Secretary or other official in Department of the Interior relating to review of the Corps of Engineers' dredged and fill material permits and such functions of Secretary of the Army, Chief of Engineers, or other official in Corps of Engineers of the United States Army relating to compliance with dredged and fill material permits issued under this section with respect to pre-construction, construction, and initial operation of transportation system for Canadian and Alaskan natural gas were transferred to the Federal Inspector, Office of Federal Inspector for the Alaska Natural Gas Transportation System, until the first anniversary of the date of initial operation of the Alaska Natural Gas Transportation System, see Reorg. Plan No. 1 of 1979, §§102(a), (b), (e), 203(a), 44 F.R. 33663, 33666, 93 Stat. 1373, 1376, effective July 1, 1979, set out in the Appendix to Title 5, Government Organization and Employees. Office of Federal Inspector for the Alaska Natural Gas Transportation System abolished and functions and authority vested in Inspector transferred to Secretary of Energy by section 3012(b) of Pub. L. 102-486 set out as an Abolition of Office of Federal Inspector note under section 719e of Title 15, Commerce and Trade. Functions and authority vested in Secretary of Energy subsequently transferred to Federal Coordinator for Alaska Natural Gas Transportation Projects by section 720d(f) of Title 15.
CONTIGUOUS ZONE OF UNITED STATES For extension of contiguous zone of United States, see Proc. No. 7219, set out as a note under section 1331 of Title 43, Public Lands.
- State
- The term "State" means a State, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and the Trust Territory of the Pacific Islands.
- contiguous zone
- The term "contiguous zone" means the entire zone established or to be established by the United States under article 24 of the Convention of the Territorial Sea and the Contiguous Zone.
- interstate agency
- The term "interstate agency" means an agency of two or more States established by or pursuant to an agreement or compact approved by the Congress, or any other agency of two or more States, having substantial powers or duties pertaining to the control of pollution as determined and approved by the Administrator.
- navigable waters
- The term "navigable waters" means the waters of the United States, including the territorial seas.
- ocean
- The term "ocean" means any portion of the high seas beyond the contiguous zone.
- person
- The term "person" means an individual, corporation, partnership, association, State, municipality, commission, or political subdivision of a State, or any interstate body.
- pollution
- The term "pollution" means the man-made or man-induced alteration of the chemical, physical, biological, and radiological integrity of water.
- territorial seas
- The term "territorial seas" means the belt of the seas measured from the line of ordinary low water along that portion of the coast which is in direct contact with the open sea and the line marking the seaward limit of inland waters, and extending seaward a distance of three miles.