Not later than 12 months after December 16, 2003, the Board of Regents shall designate a site for the Museum.
In designating a site under subparagraph (A), the Board of Regents shall select from among the following sites in the District of Columbia:
A site described in subparagraph (B) shall remain available until the date on which the Board of Regents designates a site for the Museum under subparagraph (A).
Except with respect to a site described in clause (i) of subparagraph (B), if the site designated for the Museum is in an area that is under the administrative jurisdiction of a Federal agency, as soon as practicable after the date on which the designation is made, the head of the Federal agency shall transfer to the Smithsonian Institution administrative jurisdiction over the area.
The Board of Regents shall carry out its duties under this paragraph in consultation with the following:
The Board of Regents, in consultation with the Council, may plan, design, and construct a building for the Museum, which shall be located at the site designated by the Board of Regents under this paragraph.
Chapter 89 of title 40 shall not apply with respect to the Museum.
The Board of Regents shall pay-
There are authorized to be appropriated such sums as are necessary to carry out this section.
20 U.S.C. § 80r-6
STATUTORY NOTES AND RELATED SUBSIDIARIES
PROCUREMENT FOR CONSTRUCTION Pub. L. 112-74, 125 Stat. 1033, provided in part: "That during fiscal year 2012 and any succeeding fiscal year, a single procurement for construction of the National Museum of African American History and Culture, as authorized under section 8 of the National Museum of African American History and Culture Act (20 U.S.C. 80r-6), may be issued that includes the full scope of the project".