16 U.S.C. § 837c

Current through P.L. 118-107 (published on www.congress.gov on 11/21/2024)
Section 837c - Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest

Any contract of the Secretary for the sale or exchange of electric energy generated at, or peaking capacity of, Federal hydroelectric plants in marketing areas outside the Pacific Northwest for use within the Pacific Northwest shall be subject to limitations and conditions corresponding to those provided in sections 837a and 837b of this title for any contract for the sale or exchange of hydroelectric energy or peaking capacity generated within the Pacific Northwest for use outside the Pacific Northwest.

16 U.S.C. § 837c

Pub. L. 88-552, §4, Aug. 31, 1964, 78 Stat. 757.
Pacific Northwest
"Pacific Northwest" means (1) the region consisting of the States of Oregon and Washington, the State of Montana west of the Continental Divide, and such portions of the States of Nevada, Utah, and Wyoming within the Columbia drainage basin and of the State of Idaho as the Secretary may determine to be within the marketing area of the Federal Columbia River power system, and (2) any contiguous areas, not in excess of seventy-five airline miles from said region, which are a part of the service area of a rural electric cooperative served by the Administrator on December 5, 1980, which has a distribution system from which it serves both within and without said region.
Secretary
"Secretary" means the Secretary of Energy.