16 U.S.C. § 828b

Current through P.L. 118-107 (published on www.congress.gov on 11/21/2024)
Section 828b - Exemption from formula, books and records, and project cost statement requirements; annual charges

Section 807 of this title pertaining to the taking over by the United States of any project upon or after the expiration of a license, and sections 825 and 825a of this title requiring certain records and accounting procedures and section 797(b) of this title requiring the preparation and filing of the statement of actual legitimate original cost of a project, shall not be applicable to any project owned by a State or municipality, and such rights and requirements shall not exist under any license heretofore or hereafter granted to any State or municipality. The Secretary of Energy in determining the amount of annual charges applicable to any such project may determine the annual charges with reference to the actual cost of services incurred by the Secretary with respect to the project.

16 U.S.C. § 828b

Aug. 15, 1953, ch. 503, §3, 67 Stat. 587; Pub. L. 86-124, July 31, 1959, 73 Stat. 271; Pub. L. 95-91, title III, §301(b), Aug. 4, 1977, 91 Stat. 578.

EDITORIAL NOTES

CODIFICATIONSection was not enacted as part of the Federal Power Act which generally comprises this chapter.

AMENDMENTS1959- Pub. L. 86-124 struck out "except that the provisions of sections 797(b) and 807 of this title shall continue to be applicable to any license issued for a hydroelectric development in the International Rapids section of the Saint Lawrence River" in first sentence.

STATUTORY NOTES AND RELATED SUBSIDIARIES

TRANSFER OF FUNCTIONS "Secretary of Energy" and "Secretary" substituted in text for "Federal Power Commission" and "Commission", respectively, pursuant to Pub. L. 95-91, §301(b), which is classified to section 7151(b) of Title 42, The Public Health and Welfare.The Federal Power Commission was terminated, and its functions, personnel, property, funds, etc., were transferred to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission) by sections 7151(b), 7171(a), 7172(a), 7291, and 7293 of Title 42.

Commission
"Commission" and "Commissioner" means the Federal Power Commission, and a member thereof, respectively;
State
"State" means a State admitted to the Union, the District of Columbia, and any organized Territory of the United States;
municipality
"municipality" means a city, county, irrigation district, drainage district, or other political subdivision or agency of a State competent under the laws thereof to carry on the business of developing, transmitting, utilizing, or distributing power;
project
"project" means complete unit of improvement or development, consisting of a power house, all water conduits, all dams and appurtenant works and structures (including navigation structures) which are a part of said unit, and all storage, diverting, or forebay reservoirs directly connected therewith, the primary line or lines transmitting power therefrom to the point of junction with the distribution system or with the interconnected primary transmission system, all miscellaneous structures used and useful in connection with said unit or any part thereof, and all water-rights, rights-of-way, ditches, dams, reservoirs, lands, or interest in lands the use and occupancy of which are necessary or appropriate in the maintenance and operation of such unit;