Whenever the Commission, after notice and opportunity for hearing, finds such action necessary or desirable in the public interest, it may by order direct a natural-gas company to extend or improve its transportation facilities, to establish physical connection of its transportation facilities with the facilities of, and sell natural gas to, any person or municipality engaged or legally authorized to engage in the local distribution of natural or artificial gas to the public, and for such purpose to extend its transportation facilities to communities immediately adjacent to such facilities or to territory served by such natural-gas company, if the Commission finds that no undue burden will be placed upon such natural-gas company thereby: Provided, That the Commission shall have no authority to compel the enlargement of transportation facilities for such purposes, or to compel such natural-gas company to establish physical connection or sell natural gas when to do so would impair its ability to render adequate service to its customers.
No natural-gas company shall abandon all or any portion of its facilities subject to the jurisdiction of the Commission, or any service rendered by means of such facilities, without the permission and approval of the Commission first had and obtained, after due hearing, and a finding by the Commission that the available supply of natural gas is depleted to the extent that the continuance of service is unwarranted, or that the present or future public convenience or necessity permit such abandonment.
Application for certificates shall be made in writing to the Commission, be verified under oath, and shall be in such form, contain such information, and notice thereof shall be served upon such interested parties and in such manner as the Commission shall, by regulation, require.
Except in the cases governed by the provisos contained in subsection (c)(1) of this section, a certificate shall be issued to any qualified applicant therefor, authorizing the whole or any part of the operation, sale, service, construction, extension, or acquisition covered by the application, if it is found that the applicant is able and willing properly to do the acts and to perform the service proposed and to conform to the provisions of this chapter and the requirements, rules, and regulations of the Commission thereunder, and that the proposed service, sale, operation, construction, extension, or acquisition, to the extent authorized by the certificate, is or will be required by the present or future public convenience and necessity; otherwise such application shall be denied. The Commission shall have the power to attach to the issuance of the certificate and to the exercise of the rights granted thereunder such reasonable terms and conditions as the public convenience and necessity may require.
Nothing contained in this section shall be construed as a limitation upon the power of the Commission to grant certificates of public convenience and necessity for service of an area already being served by another natural-gas company.
When any holder of a certificate of public convenience and necessity cannot acquire by contract, or is unable to agree with the owner of property to the compensation to be paid for, the necessary right-of-way to construct, operate, and maintain a pipe line or pipe lines for the transportation of natural gas, and the necessary land or other property, in addition to right-of-way, for the location of compressor stations, pressure apparatus, or other stations or equipment necessary to the proper operation of such pipe line or pipe lines, it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such property may be located, or in the State courts. The practice and procedure in any action or proceeding for that purpose in the district court of the United States shall conform as nearly as may be with the practice and procedure in similar action or proceeding in the courts of the State where the property is situated: Provided, That the United States district courts shall only have jurisdiction of cases when the amount claimed by the owner of the property to be condemned exceeds $3,000.
15 U.S.C. § 717f
EDITORIAL NOTES
AMENDMENTS1988-Subsec. (f). Pub. L. 100-474 designated existing provisions as par. (1) and added par. (2).1978-Subsec. (c). Pub. L. 95-617, §608(a), (b)(1), designated existing first paragraph as par. (1)(A) and existing second paragraph as par. (1)(B) and added par. (2). Subsec. (e). Pub. L. 95-617, §608(b)(2), substituted "subsection (c)(1)" for "subsection (c)".1947-Subsec. (h). Act July 25, 1947, added subsec. (h). 1942-Subsecs. (c) to (g). Act Feb. 7, 1942, struck out subsec. (c), and added new subsecs. (c) to (g).
STATUTORY NOTES AND RELATED SUBSIDIARIES
EFFECTIVE DATE OF 1988 AMENDMENTPub. L. 100-474, §3, Oct. 6, 1988, 102 Stat. 2302, provided that: "The provisions of this Act [amending this section and enacting provisions set out as a note under section 717w of this title] shall become effective one hundred and twenty days after the date of enactment [Oct. 6, 1988]."
EXECUTIVE DOCUMENTS
TRANSFER OF FUNCTIONSEnforcement functions of Secretary or other official in Department of Energy and Commission, Commissioners, or other official in Federal Energy Regulatory Commission related to compliance with certificates of public convenience and necessity issued under this section with respect to pre-construction, construction, and initial operation of transportation system for Canadian and Alaskan natural gas transferred to Federal Inspector, Office of Federal Inspector for Alaska Natural Gas Transportation System, until first anniversary of date of initial operation of Alaska Natural Gas Transportation System, see Reorg. Plan No. 1 of 1979, §§102(d), 203(a), 44 F.R. 33663, 33666, 93 Stat. 1373, 1376, effective July 1, 1979, set out under section 719e of this title. Office of Federal Inspector for the Alaska Natural Gas Transportation System abolished and functions and authority vested in Inspector transferred to Secretary of Energy by section 3012(b) of Pub. L. 102-486, set out as an Abolition of Office of Federal Inspector note under section 719e of this title. Functions and authority vested in Secretary of Energy subsequently transferred to Federal Coordinator for Alaska Natural Gas Transportation Projects by section 720d(f) of this title.
- Commission
- "Commission" and "Commissioner" means the Federal Power Commission, and a member thereof, respectively.
- Interstate commerce
- "Interstate commerce" means commerce between any point in a State and any point outside thereof, or between points within the same State but through any place outside thereof, but only insofar as such commerce takes place within the United States.
- Municipality
- "Municipality" means a city, county, or other political subdivision or agency of a State.
- Natural gas
- "Natural gas" means either natural gas unmixed, or any mixture of natural and artificial gas.
- Natural-gas company
- "Natural-gas company" means a person engaged in the transportation of natural gas in interstate commerce, or the sale in interstate commerce of such gas for resale.
- Person
- "Person" includes an individual or a corporation.
- State commission
- "State commission" means the regulatory body of the State or municipality having jurisdiction to regulate rates and charges for the sale of natural gas to consumers within the State or municipality.
- State
- "State" means a State admitted to the Union, the District of Columbia, and any organized Territory of the United States.