14 U.S.C. § 1132
EDITORIAL NOTES
AMENDMENTS2022-Subsec. (e)(2), (3). Pub. L. 117-263 added par. (2) and struck out former pars. (2) and (3) which read as follows:"(2) TYPES OF ESTIMATES.-In addition to life-cycle cost estimates that may be developed by acquisition program offices, the Commandant shall require that an independent life-cycle cost estimate be developed for each Level 1 or Level 2 acquisition project or program."(3) REQUIRED UPDATES.-For each Level 1 or Level 2 acquisition project or program the Commandant shall require that life-cycle cost estimates shall be updated before each milestone decision is concluded and the project or program enters a new acquisition phase." 2018- Pub. L. 115-282 renumbered section 572 of this title as this section.2016-Subsec. (d)(3)(B) to (J). Pub. L. 114-120 added subpars. (B) and (D) and redesignated former subpar. (B) as (C) and former subpars. (C) to (H) as (E) to (J), respectively.