Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 223.201 - Authority(a) Subject to Section 223.202, the department may enter into a comprehensive development agreement with a private entity to design, develop, finance, construct, maintain, repair, operate, extend, or expand a: (2) state highway improvement project that includes both tolled and nontolled lanes and may include nontolled appurtenant facilities;(3) state highway improvement project in which the private entity has an interest in the project;(4) state highway improvement project financed wholly or partly with the proceeds of private activity bonds, as defined by Section 141(a), Internal Revenue Code of 1986; or(5) nontolled state highway improvement project authorized by the legislature.(b) In this subchapter, "comprehensive development agreement" means an agreement that, at a minimum, provides for the design and construction, reconstruction, rehabilitation, expansion, or improvement of a project described in Subsection (a) and may also provide for the financing, acquisition, maintenance, or operation of a project described in Subsection (a).(c) The department may negotiate provisions relating to professional and consulting services provided in connection with a comprehensive development agreement.(d) Money disbursed by the department under a comprehensive development agreement is not included in the amount: (1) required to be spent in a state fiscal biennium for engineering and design contracts under Section 223.041; or(2) appropriated in Strategy A.1.1. Plan/Design/Manage of the General Appropriations Act for that biennium for the purpose of making the computation under Section 223.041.(e) The department may authorize the investment of public and private money, including debt and equity participation, to finance a function described by this section.(f) The department may enter into a comprehensive development agreement only for all or part of: (1) the State Highway 99 (Grand Parkway) project;(2) the Interstate Highway 35E managed lanes project in Dallas and Denton Counties from Interstate Highway 635 to U.S. Highway 380;(3) the Interstate Highway 35W project in Tarrant County from Interstate Highway 30 to State Highway 114;(4) the State Highway 183 managed lanes project in Tarrant and Dallas Counties from State Highway 121 to Interstate Highway 35E;(5) the Interstate Highway 35E/U.S. Highway 67 Southern Gateway project in Dallas County, including: (A) Interstate Highway 35E from 8th Street to Interstate Highway 20; and(B) U.S. Highway 67 from Interstate Highway 35E to Farm-to-Market Road 1382 (Belt Line Road);(6) the State Highway 288 project from U.S. Highway 59 to south of State Highway 6 in Brazoria County and Harris County;(7) the U.S. Highway 290 managed lanes project in Harris County from Interstate Highway 610 to State Highway 99;(8) the Interstate Highway 820 project from State Highway 183 to Randol Mill Road;(9) the State Highway 114 project in Dallas County from State Highway 121 to State Highway 183;(10) the Loop 12 project in Dallas County from State Highway 183 to Interstate Highway 35E;(11) the Loop 9 project in Dallas and Ellis Counties from Interstate Highway 20 to U.S. Highway 67; and(12) the U.S. Highway 181 Harbor Bridge project in Nueces County between U.S. Highway 181 at Beach Avenue and Interstate Highway 37.(g) The department may combine in a comprehensive development agreement under this subchapter: (1) a toll project and a rail facility as defined by Section 91.001; or(2) two or more projects described by Subsection (f).(h) Repealed by Acts 2011, 82nd Leg., R.S., Ch. 1345, Sec. 99, eff. June 17, 2011.(i) The authority to enter into a comprehensive development agreement expires: (1) August 31, 2017, for a project described by Subsection (f), other than the State Highway 99 (Grand Parkway) project and the State Highway 183 managed lanes project; and(2) August 31, 2015, for the State Highway 183 managed lanes project.(j) Before the department may enter into a comprehensive development agreement under Subsection (f), the department must: (1) for a project other than the State Highway 99 (Grand Parkway) project, obtain, not later than August 31, 2017, the appropriate environmental clearance:(B) for the initial or base scope of the project if the project agreement provides for the phased construction of the project; and(2) present to the commission a full financial plan for the project, including costing methodology and cost proposals.(k) Not later than December 1, 2014, the department shall provide a report to the commission on the status of a project described by Subsection (f). The report must include:(1) the status of the project's environmental clearance;(2) an explanation of any project delays; and(3) if the procurement is not completed, the anticipated date for the completion of the procurement.(l) In this section, "environmental clearance" means:(1) a finding of no significant impact has been issued for the project or, as applicable, for the initial or base scope of the project; or(2) for a project for which an environmental impact statement is prepared, a record of decision has been issued for that project or, as applicable, for the initial or base scope of the project.(m) The department may not develop a project under this section as a project under Chapter 227.Tex. Transp. Code § 223.201
Acts 2013, 83rd Leg., R.S., Ch. 1234 (S.B. 1730), Sec. 1, eff. September 1, 2013 Acts 2011, 82nd Leg., R.S., Ch. 1345 (S.B. 1420), Sec. 99, eff. June 17, 2011 Acts 2011, 82nd Leg., R.S., Ch. 1345 (S.B. 1420), Sec. 31, eff. June 17, 2011 Acts 2011, 82nd Leg., R.S., Ch. 259 (H.B. 1201), Sec. 7, eff. June 17, 2011Amended by: Acts 2007, 80th Leg., R.S., Ch. 264 (S.B. 792), Sec. 4.01, eff. June 11, 2007Added by Acts 2005, 79th Leg., Ch. 281 (H.B. 2702), Sec. 2.21, eff. June 14, 2005.